Framework Agreement Sewerage Projects Implementation Department
A framework agreement for sewerage projects at the Municipality of Breda, published on 14 November 2025. The procurement follows the EU open procedure (ARW 2016) and focuses on preparatory works, earthworks, paving, connections, street drainage, main sewer, and root removal. A maximum of five market parties will be included in the shortlist; the lowest total price determines the selection. Rates are calculated via averages after excluding the highest and lowest bids. The maximum contract value is €9.3 million (incl. 50% unforeseen margin). The agreement has a standard term of 2 years, starting 1 November 2025, with the possibility of two extensions of one year each. There is no obligation to purchase for the contracting authority.
Works · Open · European procedure
01What is being requested
A framework agreement for sewerage projects at the Municipality of Breda, published on 14 November 2025. The procurement follows the EU open procedure (ARW 2016) and focuses on preparatory works, earthworks, paving, connections, street drainage, main sewer, and root removal. A maximum of five market parties will be included in the shortlist; the lowest total price determines the selection. Rates are calculated via averages after excluding the highest and lowest bids. The maximum contract value is €9.3 million (incl. 50% unforeseen margin). The agreement has a standard term of 2 years, starting 1 November 2025, with the possibility of two extensions of one year each. There is no obligation to purchase for the contracting authority.
ProcedurenAanbesteding via de Europese openbare procedure conform hoofdstuk 2 van het ARW 2016.n%nOpdrachtgeverDe opdrachtgever bij deze aanbesteding is de Gemeente Breda. Voor meer informatie over de Gemeente Breda verwijzen wij u naar de website van de gemeente: www.breda.nl.%n%nOpdrachtHet werk bestaat in hoofdzaak uit:na. het uitvoeren van voorbereidende werkzaamheden;nb. het verwijderen en opnieuw aanbrengen van verhardingen;nc. het uitvoeren van grondwerken;nd. het aanbrengen en vervangen van aansluitingen op het riool;e. het aanbrengen en vervangen van straatafwatering;f. het aanbrengen
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the term of the framework agreement and are there extension possibilities?
How are the rates determined for the sub-contracts during the term?
How many parties will be included in the shortlist and how does the selection take place?
Is there an obligation to purchase for the Municipality of Breda under this framework agreement?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159