AwardedWorksEuropeanOpen

Framework agreement for relining sewage transport pipelines

Waterschap Vallei en Veluwe · Open · 1 lots · 370258
Type
Works
45231300
Estimated value
€ 6,00M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project concerns the renovation of the sewage transport pipeline between 't Harde and Oostendorp by means of relining and partial repairs. Execution takes place under the conditions of the UAV-GC 2025 and the existing framework agreement.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€6,000,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

The contract concerns the repair of the sewage transport pipeline 't Harde - Oostendorp by means of relining (CIPP method), partial repairs, and repair of inspection manholes within the existing framework agreement.

The contract concerns the commissioning of a framework agreement for the relining of sewage transport pipelines under gravity flow based on CIPP liners.

45231300€ 6,00MWorks
1Main contract€6,000,000

02Outcome

Awarded

Renotec N.V.

Bidders
2

03Strategic insight

Strategic insight · AI analysis
The bidder must take the CIPP method into account as a mandatory renovation technique. It is essential to closely manage the environmental factors and communication with local residents. Given the provisional sum for the overflow wall, coordination after inspection is necessary.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 6
The relining must take place based on CIPP liners.Important
It is expected that bronnering will be necessary to ensure quality.Important
The works on the overflow wall in manhole 287tlTAput3026 are a provisional sum.Important
The maximum duration of the sewage system closure must be monitored.Important
The roads Coragestraat and Vrijheidsstraat may be closed for a maximum of one day.Important
Sampling for laboratory analysis takes place once per working day.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

€6,000,000

07Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME9992×
2BAM Infra B.V.SME9977×
3Heijmans Infra B.V.SME9965×
4Van Gelder BVSME9953×
5De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9726×
6Gebr. van Kessel Wegenbouw B.V.SME9620×

08Tender documents

TN508008 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250822114950pdfAug 24, 2025 · 8 KB
GEWIJZIGD Prijzenblad dd 12-5-25xlsxMay 13, 2025 · 23 KB
Nota van inlichtingen 2025-05-12-1pdfMay 12, 2025 · 33 KB
Nota van inlichtingen 2025-04-18-2pdfApr 18, 2025 · 7 KB
NOK 1_Harde-Oostendorp_stengenlijst_20250416xlsxApr 18, 2025 · 12 KB
GEWIJZIGD Prijzenblad dd 4-4-25xlsxApr 7, 2025 · 23 KB
afbeelding koker deelopdracht 3jpgApr 7, 2025 · 128 KB
NOK 2_Dernhorstlaan-Twello_strengenlijst_20250403xlsxApr 7, 2025 · 11 KB
Nota van inlichtingen 2025-04-07-3pdfApr 7, 2025 · 3 KB
Nota van inlichtingen 2025-04-02-1pdfApr 7, 2025 · 37 KB
TN508008 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250331164759pdfMar 31, 2025 · 8 KB
DOC-0047 - Kaart-DernhorstlaanpdfMar 11, 2025 · 663 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the specific content of the contract?
The contract concerns a framework agreement for the relining of sewage transport pipelines under gravity flow based on CIPP liners.
Which technical methodology is used during execution?
The works are carried out by means of relining sewage transport pipelines under gravity flow using CIPP liners.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 6,0 mln

Gegunde waarden in CPV 45 · werken n=3159