ClosedWorksEuropeanSME-friendlyOpen

Framework agreement ‘development and realization of large real estate projects’

Centraal Orgaan opvang asielzoekers (COA) · Open · 5 lots · 359728
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Centraal Orgaan opvang asielzoekers (COA) intends to enter into a framework agreement for five geographical lots for large construction projects. The agreement has a duration of two years with two option years and can include a maximum of five contractors. The assignments exceed the EU threshold for works and require broad expertise in site, building, and installation engineering. Projects vary from demolition and renovation of monuments to transformation and new construction. The procedure is public, allowing all interested parties to bid freely. The COA expects an integrated approach where one contractor can coordinate multiple disciplines, with a strong focus on quality, safety, and timely delivery.

Works · Open · European procedure · SME-friendly

SME-friendlyEuropean
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
5
5 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksSME-friendlyEU tenderframework agreementreal estate projectsworks

01What is being requested

The Centraal Orgaan opvang asielzoekers (COA) intends to enter into a framework agreement for five geographical lots for large construction projects. The agreement has a duration of two years with two option years and can include a maximum of five contractors. The assignments exceed the EU threshold for works and require broad expertise in site, building, and installation engineering. Projects vary from demolition and renovation of monuments to transformation and new construction. The procedure is public, allowing all interested parties to bid freely. The COA expects an integrated approach where one contractor can coordinate multiple disciplines, with a strong focus on quality, safety, and timely delivery.

The objective of this tender is to enter into a framework agreement (for a duration of 2 years with 2 option years) for each of the 5 geographical lots, with a maximum of 5 contractors for the execution of works, namely larger construction projects with a contract value above the EU threshold for Works. The contractors must have knowledge and experience in all disciplines (including site, building, and installation engineering) and the diversity of our projects (including demolition, monument renovation, transformation, and new construction).

45000000Works
1central west region
2Central east region
3South-east region
4South-west region
5North region

02Breakdown by lot

central west regionn/a
Central east regionn/a
South-east regionn/a
South-west regionn/a
North regionn/a

Per-lot values not published — bars show only the lot breakdown.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Likely competitors

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME10034×
2Heijmans Utiliteit B.V.SME9927×
3Dura Vermeer Infra Regionale Projecten BVSME9758×
4BAM Infra B.V.SME9777×
5Constructif B.V.SME9112×
6Bertens Bouw B.V.SME9013×

06Legal themes that may be relevant here

07Frequently asked questions

What is the expected duration of the framework agreement?
The framework agreement has a duration of 2 years, with the possibility of 2 option years.
What expertise is expected from the contractors?
Contractors must have knowledge and experience in all disciplines, including site, building, and installation engineering.
What types of construction projects fall under this framework agreement?
Projects vary from demolition and renovation of monuments to transformation and new construction.
How many contractors can be selected per lot?
A maximum of 5 contractors can be selected for each of the geographical lots.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159