ClosedWorksEuropeanOpenGreen

Framework Agreement Maintenance Paving Elements 2024-2027 (spec 24-03)

Gemeente Roosendaal · Open · 330904
Type
Works
45233141
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Roosendaal is proposing an open EU procurement for a four-year framework agreement (2024-2027) for the maintenance of paving elements. One contractor will be selected to perform works per location or across multiple locations based on a partial tender, prepared according to the unit prices in the agreement. The works include removing paving, breaking foundations, excavating, processing, finishing, and transporting soil, applying foundations, re-applying paving, and additional tasks. Integral projects, reconstructions, housing-related projects, works related to cables and pipelines, and daily minor maintenance under the WVS service specification are excluded from the agreement. The municipality reserves the right to carry out works internally. The procurement follows the open procedure and requires a detailed price quotation per unit, approval by the management, and compliance with EU procurement rules.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPframework agreementmaintenancepaving elements

01What is being requested

The Municipality of Roosendaal is proposing an open EU procurement for a four-year framework agreement (2024-2027) for the maintenance of paving elements. One contractor will be selected to perform works per location or across multiple locations based on a partial tender, prepared according to the unit prices in the agreement. The works include removing paving, breaking foundations, excavating, processing, finishing, and transporting soil, applying foundations, re-applying paving, and additional tasks. Integral projects, reconstructions, housing-related projects, works related to cables and pipelines, and daily minor maintenance under the WVS service specification are excluded from the agreement. The municipality reserves the right to carry out works internally. The procurement follows the open procedure and requires a detailed price quotation per unit, approval by the management, and compliance with EU procurement rules.

This concerns an open EU procurement of works for the Maintenance of Paving Elements in Roosendaal. The contracting authority wishes to enter into a framework agreement for a period of 4 years with one contractor.

45233141Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Boskalis Nederland B.V.SME10069×
3D. van der Steen B.V.SME10031×
4Combinatie Heijmans - SWARCOUnknown9973×
5Heijmans Infra B.V.SME9965×
6NTP B.V.SME9922×

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope and duration of the framework agreement?
The framework agreement is intended for the maintenance of paving elements and has a duration of 4 years (2024-2027).
Which specific works are covered under this agreement?
The works include removing paving, breaking foundations, excavating, processing, finishing, and transporting soil, applying foundations, applying paving, and additional works.
How are the assignments within the framework agreement communicated?
The management assigns works per location or bundled across multiple locations. The contractor prepares a partial tender based on the agreed unit prices, after which the partial assignment is issued following approval.
Which works are explicitly excluded from this agreement?
Integral projects (requiring coordination with greenery or lighting), reconstructions with large-scale underground infrastructure, projects resulting from housing construction, works related to cables and pipelines, and daily minor maintenance under the WVS service specification fall outside the agreement.
Does the contracting authority have the right to carry out works themselves?
Yes, the contracting authority reserves the right to have the works carried out by its own service.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159