Framework Agreement Asphalt Maintenance 2025-2026
Framework agreement for the execution of major and minor asphalt maintenance in the Municipality of Gouda with a maximum duration of 4 years. The award is made exclusively on the basis of the lowest price.
Works · Open · European procedure
01What is being requested
The assignment concerns a framework agreement for asphalt maintenance in the Municipality of Gouda, consisting of major and minor maintenance to asphalt pavings, markings, and detection loops. The duration is 2 years with two possible extensions of 1 year each.
The assignment for the Asphalt Maintenance project concerns the management of the existing asphalt paving in the public space where the Municipality of Gouda is responsible as the manager for the asphalt maintenance. The exact works are described in the RAW framework agreement: Asphalt Maintenance 2025-2026. Regularly, the work consists mainly of: a. Removal and application of closed road surfacing; b. Repair works to asphalt pavings; c. Maintenance of markings and detection loops on / in asphalt pavings; d. Carrying out asphalt research for the purpose of sub-assignments; e. Works in th
02Strategic insight
Take into account the strict penalty clause in case of delay in completion. Ensure good equipment planning due to the varying accessibility of locations. Verify the indexation of prices, which takes place annually.
03Points of attention
04Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
05Award criteria
The award takes place on the basis of the price in accordance with the Tender Schedule.
06Process & timeline
07Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
08Bidders in this segment
09Tender documents
10Legal themes that may be relevant here
11Frequently asked questions
What does the assignment for asphalt maintenance entail?
What specific requirements apply to the use of blue pigment in the road surfacing?
Which CROW publication and figure numbers are relevant for the traffic measures?
What is the extent of the asphalt pavings within the municipality?
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln