Framework Agreement 7 Leidsche Rijn – making residential ready
The Municipality of Utrecht has placed a framework agreement (Framework Agreement 7 Leidsche Rijn – making residential ready) on the market to prepare sub-areas in Leidsche Rijn and surrounding areas for housing construction. The assignment includes preparing the sites, implementing the necessary infrastructure (water, sewerage, electricity, gas, internet) and ensuring compliance with building and environmental standards. The objective is to make the locations fully residential ready, so that housing construction projects can start without delay. The procedure is public, allowing a wide range of contractors to participate. The contracting authority expects a transparent, cost-efficient, and timely result, with attention to sustainability and integration into the existing urban network. The framework agreement offers flexibility for multiple projects within the area, enabling economies of scale and a standardized approach.
Works · Open · European procedure
01What is being requested
The Municipality of Utrecht has placed a framework agreement (Framework Agreement 7 Leidsche Rijn – making residential ready) on the market to prepare sub-areas in Leidsche Rijn and surrounding areas for housing construction. The assignment includes preparing the sites, implementing the necessary infrastructure (water, sewerage, electricity, gas, internet) and ensuring compliance with building and environmental standards. The objective is to make the locations fully residential ready, so that housing construction projects can start without delay. The procedure is public, allowing a wide range of contractors to participate. The contracting authority expects a transparent, cost-efficient, and timely result, with attention to sustainability and integration into the existing urban network. The framework agreement offers flexibility for multiple projects within the area, enabling economies of scale and a standardized approach.
Making sub-areas in Leidsche Rijn and surroundings residential ready
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the objective of the framework agreement for Leidsche Rijn?
What does the assignment to make residential ready concretely entail?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159