ClosedWorksEuropeanOnderhandeling zonder bekendmaking

PWN.01380 HK PWN Expansion UF HF

N.V. PWN Waterleidingbedrijf Noord-Holland · Onderhandeling zonder bekendmaking · 1 lots · 341720
Type
Works
45252126
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

KB1: Landed.

Works · Onderhandeling zonder bekendmaking · European procedure

European
Contract type
Works
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

KB1: Landed.

Introduction: This announcement is used to make the intended choice of procedure known to the market in advance. This informs stakeholders and provides them with the opportunity to express their objections within 20 calendar days, starting from the day after the publication of this announcement, by means of initiating summary proceedings. Contracting Authority: The Contracting Authority and also the Client for the contract is N.V. PWN Waterleidingbedrijf Noord-Holland, hereinafter referred to as: Client. For more information, see www.pwn.nl. Short description of procurement issue: In S

45252126Works
1PWN.01380 HK PWN Expansion UF HF

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Heijmans Infra B.V.SME10065×
3ENGIE Infra & Mobility B.V.SME9969×
4Boskalis Nederland B.V.SME9969×
5Dura Vermeer Infra Regionale Projecten BVSME9858×
6Van Gelder BVSME9853×

05Legal themes that may be relevant here

06Frequently asked questions

What is the structure of the project PWN.01380 Expansion UF HF?
The project consists of three phases: the design phase, the realization phase, and the maintenance phase.
How is the price offer for the realization phase determined?
The construction team partners submit an initial price offer for the work to be assigned in the execution phase. Subsequently, individual consultations take place between the construction team partners and the Client to reach agreement through verification.
What role do the construction team partners have in the design phase?
The construction team partners are responsible for the design phase, whereby the design responsibility lies with them.
In what manner can stakeholders object to the intended choice of procedure?
Stakeholders can express their objections within 20 calendar days after the publication of the announcement by means of initiating summary proceedings.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159