OpenWorksEuropeanOpen

PRW134-PRJ1520A Execution of Nol Zeven pumping station

Waterschap Scheldestromen · Open · 1 lots · 426688
Type
Works
45000000 · Construction works
Estimated value
€ 191K
estimated
To deadline
39d
Jul 24, 2026 · 10:00
Knock-outs
2
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

Tender for a construction team collaboration for the execution of Nol Zeven pumping station by Waterschap Scheldestromen. The assignment includes the design phase and an optional implementation phase based on Best Price Quality Ratio.

Works · Open · European procedure

European2 exclusion groundsComplete timeline
Contracting authority
Waterschap Scheldestromen
Zeeland
Contract type
Works
Open
Estimated value
€190,825
estimated value
Submission deadline
July 24, 2026
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Construction works
Location
West-Zeeuws-Vlaanderen, Zeeland
CharacteristicsCPV 45WorksEU tenderGemaalCivieltechnischWerktuigbouwkundig

01What is being requested

The assignment concerns a construction team collaboration for the project PRW134-PRJ1520A Execution of Nol Zeven pumping station. The work includes the integral and controlled preparation of the conversion of the sluice culverts, whereby the contractor is responsible for the development of the civil engineering and mechanical engineering design and the coordination with other involved contractors.

The objective of this tender is to select one (1) multidisciplinary contractor, with specific expertise in civil engineering and mechanical engineering works, who will participate in the construction team phase of the project. The contracting authority reserves the right to award the implementation phase to the selected contractor as an optional subsequent step, whereby the contractor acts as the executing contractor and is integrally responsible for the realization of the works for the project. It concerns the installation of a new pumping station in the existing drainage culvert Nol Zeven,

45000000€ 191KWorks
1PRW134-PRJ1520A Execution of Nol Zeven pumping station€190,825

02Strategic insight

Strategic insight · AI analysis
<ul Focus on the integral coordination and managing the interfaces with the already present contractors for E&I, automation, and pump delivery. Ensure a technically consistent and realizable total design to minimize the risks of design conflicts and failure costs. Take into account the conditional nature of the implementation agreement; the focus in the construction team phase lies on achieving a transparent open budget.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The assignment consists of two agreements: an unconditional construction team agreement for the design phase and a conditional implementation agreement for the implementation phase.Important
The implementation agreement contains a resolutive condition whereby the contract is not awarded if the price is not acceptable in the opinion of the contracting authority.Important
The bidder must fulfill a coordinating and integrating role in relation to other (sub)contractors who have already been contracted for electrical works, automation, and the delivery of pumps.Important
The tender must be submitted fully digitally via the Mercell platform.Important
The intellectual property rights to the design are transferred or granted for use so that the contracting authority can use the design without restrictions for any potential new tender.Important

04Can I take part?

Technical · 2
Possession of a valid VCA certificate relevant to the works to be performed.Technical
Experience requirement 1: Experience with renovation of pumping stations. In the five (5) year period preceding the latest date for receipt of tenders, having professionally executed and delivered at least one (1) project within the agreed term that related to the renovation, replacement, or conversion of a pumping station or a similar hydraulic object.Technical
Exclusion ground · 2
None of the grounds for exclusion mentioned in article 2.13.1 through 2.13.5 of the ARW 2016 are applicable.Exclusion ground
None of the grounds for exclusion mentioned in article 2.13.7 and 2.13.8 of the ARW 2016 are applicable.Exclusion ground

05Exclusion grounds

Exclusion grounds (2)
  • None of the grounds for exclusion mentioned in article 2.13.1 through 2.13.5 of the ARW 2016 are applicable.
  • None of the grounds for exclusion mentioned in article 2.13.7 and 2.13.8 of the ARW 2016 are applicable.

06Award criteria

Qualityweight n/a
Priceweight n/a
Best Price Quality Ratio (BPKV)weight n/a

The award is based on the best ratio between price and quality, whereby qualitative aspects are taken into account to manage risks and failure costs and to ensure optimal value for money.

07Process & timeline

Publication date of tender/request for tender
27-05-2026
Closing date for submitting questions regarding further information for this tender
1[telefoonnummer verwijderd]:00 uur
Latest date for availability of Nota van Inlichtingen
18-06-2026
Closing date of tender period/opening of tender
24-07-2026 12:00 uur
Assessment of tenders
25-07-2026 – 31-08-2026
Expected date for sending the notice of intention to award
01-09-2026
Expected date for sending the notice of award
22-09-2026

08Value in context

€190,825

09Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9958×
2Heijmans Infra B.V.SME9965×
3Boskalis Nederland B.V.SME9969×
4ENGIE Infra & Mobility B.V.SME9969×
5VolkerRail Nederland B.V.SME9830×
6Fa. Gebr. Van der LeeUnknown9823×

10Tender documents

Beschrijving.pdfpdfMay 29, 2026 · 44 KB
Uitsluitingsgronden en geschiktheidseisen.pdfpdfMay 29, 2026 · 32 KB
Concept Bouwteamovereenkomst gemaal NOL Zeven.pdfpdfMay 29, 2026 · 7523 KB
Prijs.pdfpdfMay 29, 2026 · 25 KB
Inschrijvingsfase.pdfpdfMay 29, 2026 · 30 KB
Gunningscriteria.pdfpdfMay 29, 2026 · 24 KB
Aanbestedingsleidraad en overige aanbestedingsdocumenten.pdfpdfMay 29, 2026 · 27 KB
BIJLAGE 6 - REFERENTIES-COMPETENTIES - PRW134.docxdocxMay 29, 2026 · 43 KB
Aanbestedingsleidraad bouwteam project PRW134-PRJ1520A Uitvoering gemaal Nol Zeven.pdfpdfMay 29, 2026 · 818 KB
BIJLAGE 1 INSCHRIJFSTAAT - PRW134.docdocMay 29, 2026 · 81 KB
BIJLAGE 3 VERKLARING INZAKE GEEN RUSSISCHE BETROKKENHEID - PRW134.docxdocxMay 29, 2026 · 47 KB
BIJLAGE 2 VERKLARING OMTRENT INSCHRIJVING - PRW134.docxdocxMay 29, 2026 · 47 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the objective of the selected contractor in the construction team phase?
The selected multidisciplinary contractor with expertise in civil engineering and mechanical engineering works will participate in the construction team phase to jointly and integrally prepare the conversion of the Nol Zeven sluice culverts.
What is the intended role of the contractor after the construction team phase?
The contracting authority reserves the right to award the implementation phase to the selected contractor as an optional subsequent step, whereby the contractor acts as the executing contractor and is integrally responsible for the realization.
What specific technical characteristics do the pumps for the Nol Zeven pumping station have?
Horizontally arranged fish-friendly axial pumps are used. The pumping station must function fully automatically and with speed control and is connected to the Centrale Automatiseringssysteem (CAW).

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 191K

Gegunde waarden in CPV 45 · werken n=3159