Provincie Overijssel - N2000 - Petgaten de Wieden POP3 & LNV2
The Province of Overijssel intends to realize several peat holes by excavating old peat holes via an open procedure. The works include the removal of approximately 36 ha of swamp forest, resulting in 21 ha of open water (POP3) and 5 ha of open water (LNV2). The peat holes are scattered across various locations, primarily in swamp forest areas. The contract involves an extensive working time, with multiple locations and a large surface area of vegetation to be removed. The contracting authority expects a technical and environmentally friendly process, with attention to water quality, soil conditions, and compliance with N2000 area requirements. The tender is public, aimed at contractors with experience in water and soil engineering, and requires a detailed plan for excavation, the removal of swamp forest, and ensuring water management.
Works · Open · National procedure
01What is being requested
The Province of Overijssel intends to realize several peat holes by excavating old peat holes via an open procedure. The works include the removal of approximately 36 ha of swamp forest, resulting in 21 ha of open water (POP3) and 5 ha of open water (LNV2). The peat holes are scattered across various locations, primarily in swamp forest areas. The contract involves an extensive working time, with multiple locations and a large surface area of vegetation to be removed. The contracting authority expects a technical and environmentally friendly process, with attention to water quality, soil conditions, and compliance with N2000 area requirements. The tender is public, aimed at contractors with experience in water and soil engineering, and requires a detailed plan for excavation, the removal of swamp forest, and ensuring water management.
The objective of the works is to realize several peat holes by excavating old peat holes. The complexes of peat holes to be excavated are scattered across multiple locations. The total scope of this project concerns approximately 21 ha of open water (POP3) plus approximately 5 ha of open water (LNV2). Almost all intended locations are in areas where swamp forest currently exists. To realize the peat holes, approximately 36 ha of swamp forest will be removed.
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Legal themes that may be relevant here
05Frequently asked questions
What is the objective of the works within this project?
What is the extent of the open water surfaces to be realized?
Which works regarding vegetation must be carried out?
Automatically compiled from the official tender data and documents.
06Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159