AwardedSuppliesEuropeanOpenGreen

Project Westlus - delivery of HDPE DN900 pipe

Gemeente Rotterdam · Open · 1 lots · 343392
Type
Supplies
44130000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Project Westlus - delivery of HDPE DN900 pipe

Supplies · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 44SuppliesEU tenderGreen / SPP

01What is being requested

Project Westlus - delivery of HDPE DN900 pipe

The Contract with reference 1-L-05403-24 concerns the delivery of a total of 2,200 meters of PE 100-RC DN 900 SDR 11 pipes. These construction materials will be made available to a drilling contractor to be contracted separately, who must assemble them into 2 lengths of 1,100 meters. The result of the tender must be that the two assembled lengths of 1,100 meters are ready no later than the start date of the drilling. The execution of the drilling is currently scheduled for October 2025. The Contracting Authority reserves the right to adjust this schedule.

44130000Supplies
1Project Westlus - delivery of HDPE DN900 pipe €1

02Outcome

Awarded

De Jongh Pipesystems B.V.

Bidders
2

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Aebi Schmidt Nederland B.V.SME8720×
2KH Plastics B.V.SME72
3Technische Unie B.V.SME72
4De Jongh Pipesystems B.V.SME71
5Giverbo BVSME70
6REMONDIS Smart Infra B.V.SME69

06Legal themes that may be relevant here

07Frequently asked questions

What is the exact specification of the pipes to be delivered?
The contract concerns the delivery of a total of 2,200 meters of PE 100-RC DN 900 SDR 11 pipes.
How must the delivered pipes be processed?
The construction materials will be made available to a drilling contractor to be contracted separately, who must assemble the pipes into two lengths of 1,100 meters each.
When must the assembled pipe lengths be ready?
The two assembled lengths of 1,100 meters must be ready no later than the start date of the drilling. The execution of the drilling is currently scheduled for October 2025.
Is the drilling schedule final?
No, the contracting authority reserves the right to adjust the current schedule for the drilling, which is scheduled for October 2025.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 393K
median
€ 1,0 mln
p75
€ 5,0 mln
deze opdracht

Gegunde waarden in CPV 44 · leveringen n=425