Project Reconstruction “Construction Team Kindcentrum Tuinstraat”

Gemeente Krimpen aan den IJssel · Open · 1 lots · 357689
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project concerns the replacement reconstruction of an integrated child center consisting of education, childcare, and sports facilities. The design must meet specific spatial, functional, and technical requirements based on a shared vision.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPconstruction teamprimary schoolgymnasium

01What is being requested

The assignment concerns the reconstruction of a child center at the Tuinstraat in Krimpen aan den IJssel, consisting of a school, childcare, and a gymnasium with a total 1,493 m2 GFA.

The Municipality of Krimpen aan den IJssel wishes to tender a Construction Team participant (reconstruction) for the realization of the (new) primary school and gymnasium. For this project, it is looking for the most qualified party or parties to collaborate with. To this end, it follows a European Open procurement procedure. It wishes to contract a contractor who, as part of the construction team, is expected to be involved in the further elaboration of the project. Based on its knowledge and expertise, the contractor is expected to provide input during the design process. This allows for a p

45000000Works
1Project Reconstruction “Construction Team Kindcentrum Tuinstraat”

02Strategic insight

Strategic insight · AI analysis
Focus on the design on the user vision of the three different parties. Integrate the core values such as warm welcome and togetherness into the building concept. Ensure a design that aligns with the sustainability ambitions and the desired flexibility.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
The intended organizational form for construction is a construction team.Important
An depreciation period of 50 years is aimed for.Important
The building must comply with the BENG requirements.Important
There is an ambition for gasless construction from 2030.Important
New buildings must be energy neutral (ENG) from 2040.Important
The design must take into account the metaphor of the tricolor pansy.Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Likely competitors

#Likely bidderFitWins
1BINX Smartility B.V.SME10027×
2Combinatie Heijmans - SWARCOUnknown9973×
3Dura Vermeer Infra Regionale Projecten BVSME9958×
4BAM Infra B.V.SME9977×
5KWS Infra B.V.SME9792×
6BAM Bouw en Techniek bvSME9734×

07Tender documents

2025-01-09 11498 - N001A - Rondgang en visuele inspectie, d.d. 9-1-2025pdfJan 10, 2025 · 23269 KB
2025 01-10 CONCEPT Takenlijst DNR BOUWTEAM - KC TuinstraatpdfJan 10, 2025 · 3946 KB
Nota van inlichtingen 2025-01-10-1pdfJan 10, 2025 · 11 KB
TN497410 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250110103316pdfJan 10, 2025 · 9 KB
2025-01-09 CONCEPT PLANNING Aanbesteding Bouwteam KC TuinstraatpdfJan 10, 2025 · 763 KB
2024-12-17 P60152-NOT-01 v1 Krimpen aan den IJssel beoordeling constructie schoolgebouw Tuinstraat 25pdfJan 10, 2025 · 1024 KB
TN497410 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20241218153625pdfDec 18, 2024 · 9 KB
1414_188_blad_48pdfDec 6, 2024 · 12070 KB
1414_188_blad_46pdfDec 6, 2024 · 14204 KB
BIJLAGE 7_Circulair Actieprogramma 2024-2027pdfDec 6, 2024 · 9882 KB
BG vloer en riolering met aantekeningenpdfDec 6, 2024 · 30347 KB
Lokaal basisonderwijs ApdfDec 6, 2024 · 9648 KB

08Legal themes that may be relevant here

09Frequently asked questions

What is the intended method for the realization of the Kindcentrum Tuinstraat?
The assignment is carried out via a Construction Team participant. The contractor is involved in the design process from the start to provide input through knowledge and expertise, allowing a practical design to be drawn up.
What specific tasks are expected of the contractor within the construction team?
In addition to providing input during the design process, the contractor manages the coordination of the mechanical and installation engineering services performed in the project.
In which phases does the design elaboration take place after the final award?
The design elaboration follows the phases of elaborating the feasibility study (preliminary design) and realizing the final design.
What are the most important components of the Program of Requirements (PvE)?
The PvE contains spatial, functional, and technical principles for the school, childcare, and sports facilities, including building physics requirements, mechanical installations, and the site layout.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159