AwardedWorksEuropeanRestricted

Performance-based sustainability of social real estate - Sub-task 3

Gemeente Amersfoort · Restricted · 1 lots · 289687
Type
Works
45000000
Estimated value
€ 15M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Amersfoort aims to make its social real estate portfolio more sustainable through a performance-based approach. Sub-task 3 focuses on the sustainability of seven (national) monumental buildings. For each building, a restorative and structural approach must be developed, combined with a technical installation solution that improves energy efficiency, CO₂ reduction, and comfort. The assignment requires an integrated approach that complies with monument legislation, structural standards, and energy-saving objectives. The contractor must provide a detailed plan, including feasibility studies, cost estimates, schedules, and a performance indicators plan. The municipality expects a transparent, measurable approach with clear reporting on achieved energy reductions and maintenance optimization.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€15,000,000
awarded value
Submission deadline
Ongoing
17:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Amersfoort
CharacteristicsCPV 45WorksEU tendermonumental buildingssustainabilityperformance-based

01What is being requested

The Municipality of Amersfoort aims to make its social real estate portfolio more sustainable through a performance-based approach. Sub-task 3 focuses on the sustainability of seven (national) monumental buildings. For each building, a restorative and structural approach must be developed, combined with a technical installation solution that improves energy efficiency, CO₂ reduction, and comfort. The assignment requires an integrated approach that complies with monument legislation, structural standards, and energy-saving objectives. The contractor must provide a detailed plan, including feasibility studies, cost estimates, schedules, and a performance indicators plan. The municipality expects a transparent, measurable approach with clear reporting on achieved energy reductions and maintenance optimization.

The assignment concerns the performance-based sustainability of the social real estate of the Municipality of Amersfoort. The total scope for the sustainability task is the core portfolio of the Municipality of Amersfoort. The performance-based sustainability focuses on approximately 45 buildings within the core portfolio. These buildings are logically divided into three sub-tasks. This tender concerns sub-task 3: the sustainability of 7 (national) monumental buildings, involving both a restorative/structural and a technical installation task.

45000000Works
1Lot 1

02Outcome

Awarded

Aannemingsbedrijf Nico de Bont B.V.

Award value
€15,000,000
Bidders
4

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME9534×
2Van Gelder BVSME9553×
3Croonwolter&dros B.V.SME9525×
4KWS Infra B.V.SME9492×
5Hegeman Bouw & Infra B.V.SME9431×
6Heijmans Utiliteit B.V.SME9427×

06Tender documents

TN399250 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20231108094603pdfNov 9, 2023 · 9 KB
Nota van inlichtingen 2023-03-23-1pdfMar 23, 2023 · 28 KB
Bijlage C - ConcerngarantieverklaringdocxFeb 25, 2023 · 22 KB
Bijlage B - Format referentie (deelopgave 3docxFeb 25, 2023 · 22 KB
TN399250 - SF02 Aankondiging van een opdracht 20230223123128pdfFeb 25, 2023 · 31 KB
Selectieleidraad prestatiegericht verduurzamen - deelopgave 3pdfFeb 25, 2023 · 522 KB
Bijlage D - DataleveringsovereenkomstdocFeb 25, 2023 · 50 KB
Bijlage A - Uniform_Europees_Aanbestedingsdocument_17juli2020pdfFeb 25, 2023 · 2143 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the specific scope of sub-task 3?
Sub-task 3 focuses on the sustainability of 7 (national) monumental buildings within the core portfolio of the Municipality of Amersfoort. The assignment includes both a restorative and structural task as well as a technical installation task.
Which aspects must be addressed during the sustainability of the monumental buildings?
For the seven monumental buildings, an integrated approach must be developed that combines a restorative and structural approach with a technical installation solution. This must focus on energy efficiency, CO₂ reduction, and improvement of comfort.
What are the expected deliverables from the contractor?
The contractor must provide a detailed plan consisting of feasibility studies, cost estimates, schedules, and a plan with performance indicators. A transparent approach is expected, including reporting on maintenance optimization and achieved energy reductions.
How is the total sustainability task of the Municipality of Amersfoort structured?
The total scope concerns the core portfolio of approximately 45 buildings. This portfolio is divided into three sub-tasks, where sub-task 3 specifically concerns the 7 monumental buildings.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159