Power Transformers Q1/2025 - Q2/2026
Stedin Netbeheer B.V. is requesting, via an open procedure, the supply and installation of 67 high-voltage transformers in the Stedin area, which primarily includes the provinces of Zeeland, Zuid-Holland, and Utrecht. The contract focuses on replacing or expanding the transformer network to ensure the reliability and capacity of the electricity grid. Suppliers must comply with technical specifications, safety standards, and environmental requirements, and provide a clear delivery and installation schedule. The procedure is public, promoting transparency and competition.
Supplies · Open · European procedure · SME-friendly
01What is being requested
Stedin Netbeheer B.V. is requesting, via an open procedure, the supply and installation of 67 high-voltage transformers in the Stedin area, which primarily includes the provinces of Zeeland, Zuid-Holland, and Utrecht. The contract focuses on replacing or expanding the transformer network to ensure the reliability and capacity of the electricity grid. Suppliers must comply with technical specifications, safety standards, and environmental requirements, and provide a clear delivery and installation schedule. The procedure is public, promoting transparency and competition.
Supply and installation of power transformers in Stedin Area. Stedin Area mainly covers the provinces Zeeland, South Holland and Utrecht (or part of it). Total demand is 67 pcs.
02Breakdown by lot
Per-lot values not published — bars show only the lot breakdown.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
05Likely competitors
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What is the scope of the contract for the supply of transformers?
What is the purpose of the supply of these transformers?
In which region must the transformers be installed?
Automatically compiled from the official tender data and documents.
09Estimated value versus the market
€ 260K
€ 526K
€ 1,4 mln
Gegunde waarden in CPV 31 · leveringen n=168