ClosedSuppliesMarktconsultatie

Pontveer ‘t Schouw

Provincie Noord-Holland · Marktconsultatie · 1 lots · 393216
Type
Supplies
34521000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

The province Noord-Holland is looking for a contractor for the construction of a new electric ferry for the location Het Schouw-Landsmeer.

Supplies · Marktconsultatie · National procedure

Contracting authority
Contract type
Supplies
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 34Supplies

01What is being requested

Supply of a new electric ferry for the crossing Het Schouw – Landsmeer, including a steel hull, electric propulsion, and associated technical facilities.

The contracting authority intends to launch a tender for the replacement of the current Pontveer 't Schouw. In preparation, the contracting authority is organizing a market consultation. The purpose of this market consultation is to involve market parties at an early stage, to test the feasibility of the intended principles, and to gain insight into possibilities, innovations, and risks. The new ferry must be at least equivalent to the current ferry in terms of availability, accessibility, and capacity. The aim is for the new ferry to connect to the existing abutments on both quays, so that o

34521000Supplies
1Pontveer ‘t Schouw

02Strategic insight

Strategic insight · AI analysis
Ensure a certified shipyard that can meet the strict requirements for craftsmanship and use of materials. It is essential that the planning for the supply of components is closely coordinated with the delivery date. Take into account the need for a controlled environment during construction and storage.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The construction site must be an atmospherically controlled and covered environment.Important
All products and materials, including consumables, must be new.Important
The shipyard is responsible for the insurance of the vessel, the parts, and the construction site.Important
In the event of significant deviations in weight of more than 10%, the construction supervisor must be informed.Important
The meggertest by a certified agency is a mandatory part of the shipyard testing.Important

04Can I take part?

Technical — Welding and welding methods must be carried out using the applicable materials and techniques, whereby the welders must be correctly certified.
Technical — The shipyard must have a suitable hull construction location or a finishing location that meets current Dutch requirements.

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

06Likely competitors

#Likely bidderFitWins
1Dynniq Nederland B.V.SME8940×
2Heijmans Infra B.V.SME8223×
3Vialis B.V.SME7614×
4B.V. Scheepswerf Damen HardinxveldSME69
5Scheepswerf Gebr. Kooiman BVSME63
6Alamo Group The NetherlandsUnknown61

07Tender documents

Marktconsultatie_Pontveer 't Schouw_verslagpdfOct 29, 2025 · 109 KB
Bijlage 1) Projectscope vervanging pontveer 't Schouw (1)pdfSep 18, 2025 · 462 KB
Bijlage 2) Vragenlijst Pontveer 't SchouwxlsxSep 18, 2025 · 92 KB
Aanpassing marktconsultatie Pontveer t' SchouwpdfSep 18, 2025 · 41 KB
Bijlage 5) Impressie Pontveer 1pdfSep 18, 2025 · 37 KB
TN546843 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20250918091547pdfSep 18, 2025 · 6 KB
Bijlage 3) Hoofdgegevens veerpont Het Schouw-LandsmeerpdfSep 18, 2025 · 722 KB
Bijlage 6) Impressie Pontveer 2pdfSep 18, 2025 · 37 KB
Marktconsultatiedocument Pontveer 't SchouwpdfSep 18, 2025 · 201 KB

08Legal themes that may be relevant here

09Frequently asked questions

What is the purpose of the market consultation for Pontveer ‘t Schouw?
The market consultation serves to involve market parties at an early stage, to test the feasibility of the intended principles, and to gain insight into possibilities, innovations, and risks regarding the replacement of the ferry.
What functional requirements must the new ferry meet?
The new ferry must be at least equivalent to the current ferry in terms of availability, accessibility, and capacity. Additionally, the aim is for the new ferry to connect to the existing abutments on both quays to minimize limited adjustments to the banks and shore installations.
What is the technical operation of the current ferry?
The current ferry is propelled by a steel traction cable and guided by a steel guide cable stretched between both quays. The cables are driven by an electric motor on the east side of the quay, which is operated via a Wifi connection from the ferry.
What work is required on the existing shore installation?
During the replacement of the ferry, the wear parts of the shore installation will be replaced, the propulsion will be modified to allow a drive loop with both lines side by side, and underlying structures must be made completely stainless and re-preserved.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 280K
median
€ 606K
p75
€ 1,6 mln
deze opdracht

Gegunde waarden in CPV 34 · leveringen n=1101