PD-003878 Horizontal Directional Drilling Doelwijk
The PD-003878 project by Stedin Netbeheer B.V. concerns the execution of 4,800 m of horizontal directional drilling near Doelwijk, including the supply and installation of multiple PE pipes, the pulling of 58,000 m of MV cables, and the installation of a 21 kV MV cable in an open trench. It is a closed public works procedure without a specified deadline or value.
Works · Open · European procedure
01What is being requested
The PD-003878 project by Stedin Netbeheer B.V. concerns the execution of 4,800 m of horizontal directional drilling near Doelwijk, including the supply and installation of multiple PE pipes, the pulling of 58,000 m of MV cables, and the installation of a 21 kV MV cable in an open trench. It is a closed public works procedure without a specified deadline or value.
The assignment mainly includes: - The execution of approximately 4,800 meters of horizontal directional drilling. The supply of the corresponding PE pipes (200 and 125 mm). One drilling consists of 4 to 7 PE pipes. - The pulling of approximately 58,000 meters of MV cables in these drillings. - The installation of MV cables (21kV) in an open trench of 1,500 meters. - The installation of an HDPE pipe for the fiber optic network. - The assembly of the MV cables and end terminations in the Zuidplaspolder transformer station.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What does the assignment for horizontal directional drilling entail?
What activities are involved in pulling cables?
Are cables also installed in open trenches?
What is the scope of the work regarding the fiber optic network?
What work must be carried out in the Zuidplaspolder transformer station?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln