ClosedWorksEuropeanOpen

Parking garage spoorzone Ede-Wageningen

Gemeente Ede · Open · 1 lots · 318888
Type
Works
45213312
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Ede has launched an open tender for the construction of a parking garage for P+R use as part of the new Ede/Wageningen public transport hub. The garage must connect to the new station, which will be operational at the end of February 2024, and must be completed by the summer of 2024, when the old platform tunnel will be replaced and the public space will be landscaped. The assignment includes the design, construction, finishing, and delivery of the garage, including safety and environmental requirements. The procurement is an open procedure without a CPV code, focused on a works contract. Suppliers must have experience with large-scale infrastructure projects, comply with Dutch construction and safety standards, and be capable of working within the specified timelines. The municipality expects transparent cooperation, clear project planning, and a sustainable, energy-efficient construction.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
09:30
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderP+R garagepublic transport hubEde Wageningen

01What is being requested

The Municipality of Ede has launched an open tender for the construction of a parking garage for P+R use as part of the new Ede/Wageningen public transport hub. The garage must connect to the new station, which will be operational at the end of February 2024, and must be completed by the summer of 2024, when the old platform tunnel will be replaced and the public space will be landscaped. The assignment includes the design, construction, finishing, and delivery of the garage, including safety and environmental requirements. The procurement is an open procedure without a CPV code, focused on a works contract. Suppliers must have experience with large-scale infrastructure projects, comply with Dutch construction and safety standards, and be capable of working within the specified timelines. The municipality expects transparent cooperation, clear project planning, and a sustainable, energy-efficient construction.

The parking garage for P&R use is the final piece of the new Ede/Wageningen public transport hub. This public transport hub will be commissioned in two stages: the new station will be operational by the end of February 2024. This concerns the new access to the platforms via the central platform tunnel, the new station building including built-in bicycle parking, and the bus/taxi/K&R square. Subsequently, the remainder of the old station will be dismantled, and during the summer period of 2024, the old platform tunnel will be replaced by a tunnel for slow-moving traffic, and an open-air bicycle

45213312Works
1Parking garage

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME8877×
2Van Hattum & Blankevoort N.V.SME8719×
3Dura Vermeer Infra Regionale Projecten BVSME8558×
4Van Gelder BVSME8553×
5Heijmans Infra B.V.SME8465×
6Hegeman Bouw & Infra B.V.SME8431×

05Tender documents

TN438446 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20241008104117pdfOct 9, 2024 · 9 KB
240619 PR garage OV-knoop Ede NvI2-1 Wijziging stelpost - overzichtdocxJun 19, 2024 · 23 KB
240619 PR-garage OV-knoop Ede NvI2-2 Vraag en AntwoorddocxJun 19, 2024 · 34 KB
240619 PR garage OV-knoop Ede NvI2-3 Annexen 2.0docxJun 19, 2024 · 90 KB
BE8557-RHD-ZZ-XX-ED Tekeningenset-1pdfJun 11, 2024 · 21347 KB
NvI Parkeergarage spoorzone - definitief 11 junipdfJun 11, 2024 · 578 KB
TN438446 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240611163535pdfJun 11, 2024 · 9 KB
Aanvullende Documenten - Parkeergarage spoorzone Ede-Wageningen C3BzipMay 17, 2024 · 245283 KB
Bijlage 2AD Vraagspecificatie 08-2024zipMay 14, 2024 · 157802 KB
TN438446 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240511122936pdfMay 13, 2024 · 9 KB
Bijlage 5AD ConformiteitsverklaringdocxMay 11, 2024 · 21 KB
Bijlage 8AD Derde(n)verklaringdocxMay 11, 2024 · 19 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the purpose of the construction of the parking garage?
The parking garage for P&R use forms the final piece of the new Ede/Wageningen public transport hub.
In which phase is the development of the Ede/Wageningen public transport hub?
The new station will be operational at the end of February 2024, including the central platform tunnel, the station building with bicycle parking, and the bus/taxi/K&R square. In the summer of 2024, the replacement of the old platform tunnel with a tunnel for slow-moving traffic will follow.
When will the landscaping of the public space around the public transport hub take place?
The landscaping of the public space in and around the public transport hub, as well as the construction of the P+R garage, will take place during the years 2024 and 2025.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159