AwardedSuppliesEuropeanOpen

OW.32102 Solar on WWTPs phase 2

Wetterskip Fryslân · Open · 1 lots · 349987
Type
Supplies
09331000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Wetterskip Fryslân has launched an open tender for the supply, installation, and commissioning of PV installations at various WWTP locations. The assignment includes electrical works such as the supply of PV components, NEN 1010/3140 inspections, and the installation of a teleport and data logger. Civil tasks consist of adjusting the work area, installing fencing, soil backfilling, foundation piles, and industrial plates, with specific requirements for WWTP Grou and Lemmer. Regarding mechanical engineering, the contractor must calculate, supply, and install support structures for various installation types (flat roof, pitched roof, ground-mounted, floating), as well as additional structures for field distributors, inverters, cable trays, and safety installations. The assignment requires an integrated approach of electrical, civil, and mechanical engineering expertise, with attention to safety and regulations.

Supplies · Open · European procedure

European
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 09SuppliesEU tenderPV installationWWTPelectrical engineering

01What is being requested

Wetterskip Fryslân has launched an open tender for the supply, installation, and commissioning of PV installations at various WWTP locations. The assignment includes electrical works such as the supply of PV components, NEN 1010/3140 inspections, and the installation of a teleport and data logger. Civil tasks consist of adjusting the work area, installing fencing, soil backfilling, foundation piles, and industrial plates, with specific requirements for WWTP Grou and Lemmer. Regarding mechanical engineering, the contractor must calculate, supply, and install support structures for various installation types (flat roof, pitched roof, ground-mounted, floating), as well as additional structures for field distributors, inverters, cable trays, and safety installations. The assignment requires an integrated approach of electrical, civil, and mechanical engineering expertise, with attention to safety and regulations.

Works/The work primarily concerns the following electrical, civil engineering, and mechanical engineering works: Electrical/Supply, installation, testing, and commissioning of electrical components relating to the PV installations. Carrying out NEN 1010/3140 inspections on the new and/or modified installation. The contractor will perform work at WWTP locations where PV fields have already been installed. The contractor will perform work for the installation and commissioning of the Teleport and the data logger. Civil engineering/Depending on the location, the contractor is responsible for th

09331000Supplies
1OW.32102 Solar on WWTPs phase 2

02Outcome

Awarded

SunErgetic B.V.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Eneco Zakelijk B.V.SME8721×
2E2-EnergieUnknown8610×
3SO Industrial B.V.SME81
4Innova DuurzaamUnknown78
5SunErgetic B.V.SME78
6Tenten Solar Zonnepanelen B.V.SME75

06Legal themes that may be relevant here

07Frequently asked questions

Which electrical works are part of the assignment?
The assignment includes the supply, installation, testing, and commissioning of electrical components for PV installations. Additionally, the contractor must perform NEN 1010/3140 inspections on new and/or modified installations and handle the installation and commissioning of the Teleport and the data logger.
What civil engineering works are expected from the contractor?
The civil engineering works consist of supplying and/or relocating fencing for the work area, backfilling soil to level the working surface, and installing foundation piles, screw piles, or industrial plates.
What are the mechanical engineering responsibilities within this project?
The contractor is responsible for calculating, supplying, and installing support structures for PV panels on flat roofs, pitched roofs, ground-mounted systems, and floating installations on water. This also includes the supply and installation of support structures for field distributors, inverters, cable trays, and safety installations.
Are there specific requirements for the execution at the Grou and Lemmer locations?
At the WWTP Grou location, industrial plates must be installed. At the WWTP Lemmer location, the contractor is responsible for adjusting an area before a PV installation can be placed.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 300K
median
€ 691K
p75
€ 2,0 mln
deze opdracht

Gegunde waarden in CPV 09 · leveringen n=226