AwardedServicesEuropeanOpen

Agreement for the delivery of an area-wide species management plan and pre-species management

Gemeente Simpelveld · Open · 1 lots · 364677
Type
Services
90712400
Estimated value
€ 225K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project focuses on developing an area-wide species management plan and a pre-SMP to safeguard biodiversity and protected species during the energy transition and home insulation.

Services · Open · European procedure

European
Contracting authority
Contract type
Services
Open
Estimated value
€225,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 90ServicesEU tender

01What is being requested

The assignment concerns the drafting of an area-wide species management plan (SMP) and a pre-species management plan (pre-SMP) to ensure the protection of species living in buildings during the sustainability improvement of homes.

Works must be carried out both on-site (entire Municipality of Simpelveld) and as a desk study.

90712400€ 225KServices
1Agreement for the delivery of an area-wide species management plan and pre-species management€225,000

02Outcome

Awarded

OmniVerde B.V.

Award value
€153,800
vs. estimate
-32%
Bidders
2

03Strategic insight

Strategic insight · AI analysis
Ensure a thorough baseline measurement to lay the foundation for insight into animal populations. Focus the strategy on achieving an ecological plus to meet legal requirements. Take the area-oriented approach into account for an integrated protection of the habitat.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 5
An SMP has a development time of 1 to 2 years.Important
The pre-SMP methodology serves as a temporary permit for the insulation of private homes.Important
In phase 1 of the pre-SMP, a maximum of 10% of the homes per CBS neighborhood may be made sustainable.Important
In phase 2, a maximum of 30% of the homes per CBS neighborhood may be made sustainable.Important
The total period for drafting a full-fledged SMP is a maximum of 24 months.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

€225,000

07Bidders in this segment

#Likely bidderFitWins
1Tauw bvSME8311×
2De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME8015×
3Haskoning Nederland B.V.SME74
4Aannemersbedrijf M.J. Smits B.V.SME72
5Donker Groep B.V.SME71
6OmniVerde BVSME71

08Tender documents

TN506428 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250513085940pdfMay 14, 2025 · 8 KB
Nota van inlichtingen 2025-02-06-1pdfFeb 6, 2025 · 16 KB
Bijlage 2 Prijzenblad__203343__xlsxJan 23, 2025 · 24 KB
Bijlage 8 - Onderzoeksgebied__203337__pdfJan 23, 2025 · 497 KB
Bijlage 6 - social return__203339__docxJan 23, 2025 · 22 KB
Bijlage 3 - technische bekwaamheid__203342__docxJan 23, 2025 · 22 KB
Bijlage 7 - concept overeenkomst__203338__docxJan 23, 2025 · 108 KB
uea_506428_20250115153846pdfJan 23, 2025 · 1581 KB
Aanbestedingleidraad europees v3.2 definitief__203344__docxJan 23, 2025 · 772 KB
TN506428 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250122093213pdfJan 23, 2025 · 8 KB
Bijlage 4 - financiele draagkracht__203341__docxJan 23, 2025 · 22 KB
Bijlage 9 - Handreiking opstellen (pre)SMP in Limburg__203336__pdfJan 23, 2025 · 2950 KB

09Legal themes that may be relevant here

10Frequently asked questions

What does the assignment for the species management plan entail?
The assignment includes the drafting of an area-wide species management plan (SMP) and pre-species management. The works consist of both on-site activities carried out in the entire Municipality of Simpelveld and a desk study.
What substantive requirements are set for the SMP?
The SMP must include, among other things, a description of the planning area, the planned activities of permit users, an overview of prohibitive provisions, a baseline measurement (population assessment and field research), and an impact assessment.
What is the scope of the field research within this assignment?
The works for the species management plan include a description of the research area, a population assessment, an exploration, and a description of the species-oriented field research.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 214K
median
€ 466K
p75
€ 1,2 mln
€ 225K

Gegunde waarden in CPV 90 · diensten n=2216