Raising Program Phase 3 Holy

Gemeente Vlaardingen · Restricted · 1 lots · 263727
Type
Works
45000000
Estimated value
€ 3,48M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Vlaardingen has initiated a non-public procedure for the raising program phase 3 Holy. The project focuses on replacing the existing sewerage, partially installing a new rainwater sewer (HWA), and raising the sewerage to the original construction level. Additionally, the ground level design will be optimized according to current design requirements. The works include coordination with utility companies, supporting and collecting K&L, removing and disposing of existing paving, excavating and applying sand and soil, supplying and applying paving, supplying and installing sewerage including the transferring of house connections, installing street furniture, the handover to the municipality's management departments, and environmental management. The project requires an integrated approach, precise planning, and cooperation with various stakeholders.

Works · Restricted · National procedure

Contracting authority
Contract type
Works
Restricted
Estimated value
€3,480,000
awarded value
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Vlaardingen
CharacteristicsCPV 45WorkssewerageHWAutility companies

01What is being requested

The Municipality of Vlaardingen has initiated a non-public procedure for the raising program phase 3 Holy. The project focuses on replacing the existing sewerage, partially installing a new rainwater sewer (HWA), and raising the sewerage to the original construction level. Additionally, the ground level design will be optimized according to current design requirements. The works include coordination with utility companies, supporting and collecting K&L, removing and disposing of existing paving, excavating and applying sand and soil, supplying and applying paving, supplying and installing sewerage including the transferring of house connections, installing street furniture, the handover to the municipality's management departments, and environmental management. The project requires an integrated approach, precise planning, and cooperation with various stakeholders.

The Contracting Authority has begun the preparation of the raising program phase 3 Holy. Within this project, the existing sewerage will be replaced, a new rainwater sewer (HWA) will be partially installed, the level will be raised to the original construction level, and the ground level design will be optimized based on current design requirements. [newline]Summary and global overview of the works consist of: [newline]- Coordination of utility company installation [newline]- Supporting and collecting various K&L during the execution of the works [newline]- Removing and disposing of existing

45000000Works
1Lot 1

02Outcome

Awarded

Boskalis Nederland B.V.

Award value
€3,480,000

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME10070×
2KWS Infra B.V.SME9992×
3BAM Infra B.V.SME9977×
4Heijmans Infra B.V.SME9965×
5Van Gelder BVSME9853×
6Dura Vermeer Infra Regionale Projecten BVSME9858×

05Tender documents

TN364373 - SF03 Aankondiging van een gegunde opdracht 20221220110110pdfDec 20, 2022 · 26 KB
IV-100049 Nota van Inlichtingen selectie defpdfJun 17, 2022 · 112 KB
Bijlage 4 - Protocol Social Return Gemeente MVSdocJun 8, 2022 · 91 KB
IV.100049 - Selectieleidraad Ophoogprogramma fase 3 Holy defpdfJun 8, 2022 · 1029 KB
Bijlage 3 - Format referentiesdocxJun 8, 2022 · 18 KB
TN364373 - SF02 Aankondiging van een opdracht 20220608145738pdfJun 8, 2022 · 36 KB
Bijlage 5 - CAR certificaat AON K0100134335-Gem VLD NL 2021pdfJun 8, 2022 · 250 KB
Bijlage 2 - Uniform Europees Aanbestedingsdocument OF3HpdfJun 8, 2022 · 2097 KB

06Legal themes that may be relevant here

07Frequently asked questions

What are the main works within the Raising Program Phase 3 Holy?
The works include replacing the existing sewerage, partially installing a new rainwater sewer (HWA), raising to the original construction level, and optimizing the ground level design according to current design requirements.
Which specific execution tasks are part of the assignment?
The assignment includes, among other things, the coordination of installation by utility companies, the removal and disposal of paving, the excavation and application of sand and soil, the supply of sewerage including the transferring of house connections, and the installation of street furniture.
What supporting activities are expected during execution?
In addition to the technical works, environmental management, the support and collection of K&L, and the final handover to the municipality's management departments are part of the assignment.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,5 mln

Gegunde waarden in CPV 45 · werken n=3159