ClosedWorksRestricted

Raising and redesigning of Hogendorpstraat and surroundings

Gemeente Schiedam · Restricted · 335645
Type
Works
Estimated value
Not published
To deadline
Ongoing
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

This project comprises the integral redesign and raising of the Van Hogendorpstraat in Schiedam, with a focus on climate adaptation and sustainability. The contract will be awarded based on the best price-quality ratio of 70:30.

Works · Restricted · National procedure

1 exclusion groundsComplete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
11:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksRaisingWater managementClimate-adaptive

01What is being requested

The assignment concerns the raising and redesigning of the Van Hogendorpstraat and surroundings in Schiedam, including the installation of sewerage, paving, greenery and street furniture for an estimated value of approx. € 3 million.

The main elements of the neighborhood approach are broadly as follows: • Raising and sustainable reconstruction of the public space; settlement requirement set at 25 cm over 30 years; • Climate-adaptive design of the public space and water management; • Optimization of public greenery; • Removal of old and installation of new play facilities; • Preserving as many existing trees as possible and planting new trees; • Raising cables and pipelines as a result of the raising; • Ensuring accessibility and livability for the surrounding area during execution.

Works

02Strategic insight

Strategic insight · AI analysis
Ensure a very strong plan of approach to maximize the fictitious discount on the price. Pay extra attention to the climate-adaptive measures and the water management in the design. Do not forget to correctly integrate the social conditions regarding SROI into the bid.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The assignment is an integral execution in which one contractor takes management.Important
An SROI obligation of 5% of the tender sum applies.Important
The use of incorrect data may lead to exclusion or dissolution.Important
Communication is permitted exclusively via TenderNed, except in specific exceptional situations.Important

04Can I take part?

Technical · 1
Technical and professional competenceTechnical
Financial · 1
Financial and economic capacityFinancial
Professional capability · 1
Professional competenceProfessional capability
Exclusion ground · 1
Exclusion grounds in accordance with article 2.86 and 2.87 AW 2012Exclusion ground

05Exclusion grounds

Exclusion grounds (1)
  • Exclusion grounds in accordance with article 2.86 and 2.87 AW 2012

06Award criteria

qualityweight n/a

Assessment of the plan of approach, the risk dossier, and sustainability via a fictitious discount.

price/quality ratio70:30

The award takes place on the basis of the best price-quality ratio.

07Process & timeline

Publication Selection Guidance
7-05-2024
Deadline for submitting questions for the information round
17-05-2024
Publication Note of Information
27-05-2024
Deadline for submitting Request to participate
4-06-2024
Sending selection decision
11-06-2024
Publication Tender Guidance
24-06-2024
Deadline for submitting questions for the information round
5-07-2024
Publication Note of Information
15-07-2024
Deadline for submitting Tender
25-07-2024
Publication selection award decision
8-08-2024
Final award and contracting
29-08-2024
Start execution of Assignment
Begin September 2024

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

09Likely competitors

#Likely bidderFitWins
1Van Dijk Maasland BV potentialSME40
2Verheij Infra B.V. potentialSME40
3Aannemingsbedrijf Van der Zanden Moergestel B.V. potentialSME40
4Gebr. De Leeuw B.V. potentialSME40
5Gebr. De Leeuw potentialUnknown40
6A. Bunnik B.V. potentialSME40

10Tender documents

Nota van Inlichtingen 22052024pdfMay 22, 2024 · 197 KB
Annex 4 - Verklaring geen Russische betrokkenheiddocxMay 16, 2024 · 562 KB
Bijlage 2.1_Voorbeelden Social ReturnpdfMay 7, 2024 · 480 KB
Bijlage 2.0_Spelregels SROI gemeente SchiedampdfMay 7, 2024 · 499 KB
TN466246 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240507143907pdfMay 7, 2024 · 10 KB
uea_466246_20240507133814pdfMay 7, 2024 · 1663 KB
Selectieleidraad_herinrichting van Hogendorpstraat 7-05-2024pdfMay 7, 2024 · 694 KB
Annex 2 - Formulier referentieprojectdocxMay 7, 2024 · 87 KB
TekeningenzipMay 7, 2024 · 16850 KB

11Legal themes that may be relevant here

12Frequently asked questions

What are the most important technical requirements for the reconstruction of the public space?
The reconstruction must be carried out sustainably with a specific settlement requirement of a maximum of 25 cm over a period of 30 years.
Which works are carried out regarding climate adaptation and greenery?
The assignment includes the climate-adaptive design of the public space and water management, the optimization of public greenery, the preservation of as many existing trees as possible, and the planting of new trees.
Which works are necessary for the facilities and infrastructure in the neighborhood?
The project includes the removal of old play facilities, the installation of new play facilities, and the raising of cables and pipelines as a result of the planned raising.
How is livability ensured during the execution of the works?
During the execution of the works, accessibility and livability for the surrounding area must be ensured.

Automatically compiled from the official tender data and documents.