ClosedWorksRestricted

Development of Solar Park 'Zon op Veld'

Gemeente Nijkerk · Restricted · 1 lots · 364704
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
6 criteria
Assess manuallyconfidence high

This selection procedure concerns the development of large-scale solar parks in Nijkerk, where the emphasis lies on landscape integration, natural values, and local ownership. Initiators are assessed via the Selection on Value method based on an integral initiative plan.

Works · Restricted · National procedure

1 exclusion grounds
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Development of large-scale solar parks up to a maximum of 40 hectares in the Municipality of Nijkerk for a term of 20 years.

The Municipality of Nijkerk attaches importance to the realization of sustainable energy within its municipality. On June 24, 2021, the Nijkerk municipal council therefore decided to allocate 40 hectares of large-scale solar for the RES 1.0. At the same time, there is frequent demand for space and various spatial claims must be coordinated. To ensure spatial quality, a clear vision is required for the development of solar parks. On May 12, 2021, the policy framework 'Duurzame opwek Zon op land' (Sustainable generation Solar on land) was established. This vision relates to large-scale ground-mo

45000000Works
1Development of Solar Park 'Zon op Veld'

02Strategic insight

Strategic insight · AI analysis
Ensure a very strong substantiation of local ownership as this is a very heavy-weight criterion. Focus the design specifically on multiple land use to avoid the knock-out for single use. Ensure that the soil quality and light incidence for vegetation are explicitly guaranteed in the technical plan.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The initiative plan may consist of a maximum of 20 pages.Important
Dual or multifunctional use is a knock-out criterion.Important
A letter of intent from the landowner must be added.Important
The minimum total score for selection is 36 points.Important
The plan must comply with the exception grounds for agricultural land of the Province of Gelderland.Important

04Can I take part?

Exclusion ground · 1
No application of the mandatory and optional exclusion grounds from the ESPD.Exclusion ground
Financial · 1
After selection, evidence such as a declaration of tax conduct may be requested.Financial
Technical · 2
The initiative must fall within the existing search area for solar and the project area.Technical
The initiator must demonstrate that realization is possible within the preconditions.Technical

05Exclusion grounds

Exclusion grounds (1)
  • No application of the mandatory and optional exclusion grounds from the ESPD.

06Award criteria

Life cycle and technical design planweight n/a

Assessment of construction, maintenance, management, decommissioning, recycling, sustainable use of materials, and the balance between economic and landscape/ecological benefits.

Landscape integration planweight n/a

Assessment of the design of the final image, the landscape integration, and environmental aspects in relation to landscape, ecology, cultural history, and agricultural structure.

Nature, biodiversity, soil, water and environmentweight n/a

Assessment of the improvement of natural values, biodiversity, protection of soil quality, water management, and the effects on the geese resting area.

Environmental dialogue and process participationweight n/a

Assessment of the involvement of local residents, businesses, and other stakeholders during preparation, development, and operation.

Financial feasibilityweight n/a

Assessment of the solar energy yield and the manner in which power can be structurally fed back to the grid.

Financial participation and local ownershipweight n/a

Assessment of the degree of local ownership (minimum 51%) and the possibilities for financial participation of households.

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Likely competitors

#Likely bidderFitWins
1Heijmans Utiliteit B.V.SME9427×
2Combinatie Heijmans - SWARCOUnknown9273×
3Van Gelder BVSME9253×
4KWS Infra B.V.SME9192×
5BAM Infra B.V.SME9177×
6Facilicom Solutions B.V.SME8514×

09Tender documents

Concept Ontwikkelovereenkomst Zon op veld versie 13 maart 2025pdfMar 13, 2025 · 155 KB
Nota van inlichtingen 2025-03-13pdfMar 13, 2025 · 10 KB
Selectieleidraad 1e tranche zon op veld definitief-1pdfJan 22, 2025 · 989 KB
TN466766 - EF19 Concessieaankondiging - concessierichtlijn, standaardregeling 20250122105035pdfJan 22, 2025 · 8 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the purpose of the development of the solar park?
The Municipality of Nijkerk wants to stimulate and promote the realization of sustainable energy generation. To this end, 40 hectares of large-scale solar has been allocated for the RES 1.0.
Which criteria are used in the selection of initiatives?
The selection takes place based on criteria for the life cycle and technical design plan, the landscape integration plan, nature, biodiversity, soil, water and environment, the environmental dialogue and process participation, financial participation and local ownership, and financial feasibility.
Which vision applies to the development of solar parks in Nijkerk?
The development falls under the policy framework 'Duurzame opwek Zon op land', established on May 12, 2021. This vision relates to large-scale ground-mounted solar parks.
Do smaller solar parks also fall under the current policy vision?
No, smaller solar parks for own use with a surface area of less than 250 m2 hectare fall outside the policy vision.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159