AwardedWorksRestricted

Development of seepage channel and marsh Amerongse Bovenpolder

Stichting Het Utrechts Landschap · Restricted · 1 lots · 324439
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Het Utrechts Landschap aims to strengthen the Amerongse Bovenpolder nature reserve by improving the use of seepage (emerging groundwater) and developing marshes with sedge and reed plants. Following a nature value assessment in 2019, opportunities were identified to better utilize the unique characteristics of the area. The assignment includes enlarging and improving the existing seepage channel, excavating a seepage marsh, and deepening an existing water body to enable reed development. These measures will make the existing nature stronger and more resilient to the harmful influence of nitrogen. The works must comply with Dutch laws and regulations regarding nature and water management, and must be carried out using sustainable construction methods and a comprehensive monitoring plan.

Works · Restricted · National procedure

Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksseepage channelmarshreed

01What is being requested

Stichting Het Utrechts Landschap aims to strengthen the Amerongse Bovenpolder nature reserve by improving the use of seepage (emerging groundwater) and developing marshes with sedge and reed plants. Following a nature value assessment in 2019, opportunities were identified to better utilize the unique characteristics of the area. The assignment includes enlarging and improving the existing seepage channel, excavating a seepage marsh, and deepening an existing water body to enable reed development. These measures will make the existing nature stronger and more resilient to the harmful influence of nitrogen. The works must comply with Dutch laws and regulations regarding nature and water management, and must be carried out using sustainable construction methods and a comprehensive monitoring plan.

Over the past 20 years, the Amerongse Bovenpolder has already developed into a beautiful nature reserve. In 2019, Utrechts Landschap conducted a nature value assessment, which showed that this area is of great value. During this assessment, several points emerged to better utilize the unique characteristics of the area. This relates to improving the use of seepage (emerging groundwater) and the development of marshes with sedge and reed plants. Through this improvement, the existing nature will also become stronger and more resilient to the harmful influence of nitrogen. To achieve this, the

45000000Works
1RAW specification (full assignment)

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9169×
2Dura Vermeer Infra Regionale Projecten BVSME8858×
3Van Gelder BVSME8853×
4Ploegam B.V.SME8322×
5K_Dekker bouw & infra B.V.SME8222×
6Van Hattum & Blankevoort N.V.SME8119×

04Legal themes that may be relevant here

05Frequently asked questions

What is the purpose of the works in the Amerongse Bovenpolder?
The purpose is to strengthen the nature reserve by improving the use of seepage (emerging groundwater) and the development of marshes with sedge and reed plants. This makes the existing nature stronger and more resilient to the harmful influence of nitrogen.
Which specific measures are being implemented for the seepage and the marsh?
The works include enlarging and improving the existing seepage channel, excavating a seepage marsh, and deepening an existing water body to enable reed development.
Which regulations must the works comply with?
The works must comply with Dutch laws and regulations regarding nature and water management.
On what basis were the plans for the Amerongse Bovenpolder established?
The opportunities for utilizing the unique characteristics of the area were established following a nature value assessment conducted in 2019.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159