Design, implementation and commissioning of the new Waste Water Treatment plant (WWTP) installation and integration into existing business operations
This contract concerns the design, implementation, and commissioning of a new wastewater treatment plant (WWTP) for Twence B.V. The procurement follows the procedural framework of a competitive dialogue, whereby the contractor works closely with the contracting authority to develop an optimal solution. The new installation must integrate seamlessly into existing business operations, comply with current and future environmental legislation, and improve operational efficiency. Key aspects include the design of the treatment processes, the construction of the facility, the installation of automation and control systems, and full commissioning including testing and handover. The contractor must also ensure sound project management, cost control, safety, and quality assurance. The contract requires a high level of technical expertise, experience with water and wastewater treatment, and knowledge of the relevant regulations.
Works · Competitive dialogue · European procedure
01What is being requested
This contract concerns the design, implementation, and commissioning of a new wastewater treatment plant (WWTP) for Twence B.V. The procurement follows the procedural framework of a competitive dialogue, whereby the contractor works closely with the contracting authority to develop an optimal solution. The new installation must integrate seamlessly into existing business operations, comply with current and future environmental legislation, and improve operational efficiency. Key aspects include the design of the treatment processes, the construction of the facility, the installation of automation and control systems, and full commissioning including testing and handover. The contractor must also ensure sound project management, cost control, safety, and quality assurance. The contract requires a high level of technical expertise, experience with water and wastewater treatment, and knowledge of the relevant regulations.
Design, implementation and commissioning of the new Waste Water Treatment plant (WWTP) installation and integration into existing business operations
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What activities are expected during the commissioning of the WWTP installation?
What are the most important technical aspects of the contract?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln