Design and execution project N270 Via Venray phase 1 a
The Province of Limburg has outsourced the design and execution works for the project N270 Via Venray phase 1a. The project concerns the reconstruction of the N270 between km 39.3 and 42.0, including the A73 intersections, the ‘De Blakt’ junction, and the Witte Vennenweg – Mgr Hanssenstraat roundabout. Additionally, a parallel structure for agricultural traffic will be realized. The assignment consists of several sub-projects: DP2 (reconstruction of local roads), DP3 (adjustment of the connection to the A73, shifting of the on- and off-ramps, replacement of the bicycle tunnel and traffic control systems), DP4 (replacement of the De Blakt roundabout with an intersection), DP6 (repair of the intermediate road sections) and additional works from the municipality and province. The tender is non-public, aimed at an integrated approach to design, engineering, and execution.
Works · Restricted · European procedure
01What is being requested
The Province of Limburg has outsourced the design and execution works for the project N270 Via Venray phase 1a. The project concerns the reconstruction of the N270 between km 39.3 and 42.0, including the A73 intersections, the ‘De Blakt’ junction, and the Witte Vennenweg – Mgr Hanssenstraat roundabout. Additionally, a parallel structure for agricultural traffic will be realized. The assignment consists of several sub-projects: DP2 (reconstruction of local roads), DP3 (adjustment of the connection to the A73, shifting of the on- and off-ramps, replacement of the bicycle tunnel and traffic control systems), DP4 (replacement of the De Blakt roundabout with an intersection), DP6 (repair of the intermediate road sections) and additional works from the municipality and province. The tender is non-public, aimed at an integrated approach to design, engineering, and execution.
The design and execution works were tendered for the realization of the project N270 Via Venray phase 1a, consisting of the reconstruction of the N270 between km 39.3 and 42.0, including the A73 intersections, ‘De Blakt’ junction and Witte Vennenweg - Mgr Hanssenstraat roundabout, as well as the realization of a parallel structure for agricultural traffic. The project N270 Via Venray phase 1a consists of the following components: ● Sub-project 2 (DP2): reconstruction of Zuivelweg, Molenhofweg, Laagriebroekseweg and De Locht; ● Sub-project 3 (DP3): reconstruction of the connection of the N270 t
02Outcome
Besix Infra Nederland B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
Which sub-projects does the assignment consist of?
What specific adjustments are being implemented at the connection to the A73?
What is the scope of the works around the De Blakt roundabout?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159