Design and Realisation of Modifications RWZI Arnhem Zuid
The tender concerns the design and realisation of modifications to the RWZI Arnhem Zuid, located at Drielsedijk 25. The current installation suffers from performance and availability issues, meaning that laws and regulations can no longer be fully complied with. The objective is to make the RWZI future-proof until at least 2035. The works are divided into four main lines: sludge line, new separate influent receiving works, aeration, and a green gas line. A preliminary design (VO) has already been drawn up; the contracting authority (Waterschap Rivierenland) wishes to develop the final design (DO) within a construction team (phase 1). If the contract sum for the detailed design and realisation (phase 2) is agreed upon, the contractor will be awarded the full execution. The assignment requires an integrated approach, strict compliance with environmental legislation, high quality and safety, and clear planning and cost control.
Works · European procedure
01What is being requested
The tender concerns the design and realisation of modifications to the RWZI Arnhem Zuid, located at Drielsedijk 25. The current installation suffers from performance and availability issues, meaning that laws and regulations can no longer be fully complied with. The objective is to make the RWZI future-proof until at least 2035. The works are divided into four main lines: sludge line, new separate influent receiving works, aeration, and a green gas line. A preliminary design (VO) has already been drawn up; the contracting authority (Waterschap Rivierenland) wishes to develop the final design (DO) within a construction team (phase 1). If the contract sum for the detailed design and realisation (phase 2) is agreed upon, the contractor will be awarded the full execution. The assignment requires an integrated approach, strict compliance with environmental legislation, high quality and safety, and clear planning and cost control.
The RWZI Arnhem Zuid is located at Drielsedijk 25 in Arnhem and is also accessible via this dike road. The operational management of the RWZI Arnhem Zuid has been facing bottlenecks for several years. The performance and availability of the installation are falling below standards, and permanent compliance with laws and regulations is, under current circumstances, not possible. The goal of the project 'Realisation of modifications RWZI Arnhem Zuid' is to make the RWZI future-proof in a structured manner, so that it functions well again until at least 2035. The modifications can be divided i
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What are the most important works that must be carried out?
How is the assignment structured in terms of phasing?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159