ClosedWorksEuropeanGreen

Design and Realisation of Modifications RWZI Arnhem Zuid

Type
Works
45252000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the design and realisation of modifications to the RWZI Arnhem Zuid, located at Drielsedijk 25. The current installation suffers from performance and availability issues, meaning that laws and regulations can no longer be fully complied with. The objective is to make the RWZI future-proof until at least 2035. The works are divided into four main lines: sludge line, new separate influent receiving works, aeration, and a green gas line. A preliminary design (VO) has already been drawn up; the contracting authority (Waterschap Rivierenland) wishes to develop the final design (DO) within a construction team (phase 1). If the contract sum for the detailed design and realisation (phase 2) is agreed upon, the contractor will be awarded the full execution. The assignment requires an integrated approach, strict compliance with environmental legislation, high quality and safety, and clear planning and cost control.

Works · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPRWZI Arnhem Zuidmodificationsdesign

01What is being requested

The tender concerns the design and realisation of modifications to the RWZI Arnhem Zuid, located at Drielsedijk 25. The current installation suffers from performance and availability issues, meaning that laws and regulations can no longer be fully complied with. The objective is to make the RWZI future-proof until at least 2035. The works are divided into four main lines: sludge line, new separate influent receiving works, aeration, and a green gas line. A preliminary design (VO) has already been drawn up; the contracting authority (Waterschap Rivierenland) wishes to develop the final design (DO) within a construction team (phase 1). If the contract sum for the detailed design and realisation (phase 2) is agreed upon, the contractor will be awarded the full execution. The assignment requires an integrated approach, strict compliance with environmental legislation, high quality and safety, and clear planning and cost control.

The RWZI Arnhem Zuid is located at Drielsedijk 25 in Arnhem and is also accessible via this dike road. The operational management of the RWZI Arnhem Zuid has been facing bottlenecks for several years. The performance and availability of the installation are falling below standards, and permanent compliance with laws and regulations is, under current circumstances, not possible. The goal of the project 'Realisation of modifications RWZI Arnhem Zuid' is to make the RWZI future-proof in a structured manner, so that it functions well again until at least 2035. The modifications can be divided i

45252000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9658×
2Boskalis Nederland B.V.SME9569×
3Combinatie Heijmans - SWARCOUnknown9573×
4ENGIE Infra & Mobility B.V.SME9569×
5Heijmans Infra B.V.SME9565×
6Van Hattum & Blankevoort N.V.SME9319×

05Legal themes that may be relevant here

06Frequently asked questions

What are the most important works that must be carried out?
The modifications are divided into four main lines: the sludge line (dewatering sludge), the realisation of a new separate influent receiving works, adjustments to the aeration, and the realisation of a green gas line.
How is the assignment structured in terms of phasing?
The assignment consists of two phases. In phase 1, the final design (DO) is developed within a construction team based on a previously drawn-up preliminary design (VO). If agreement is reached regarding the contract sum for phase 2, the contractor will be awarded the full execution of the detailed design and the realisation.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159