ClosedWorksEuropeanRestrictedGreen

Design and construction of new Vathorst connection road

Gemeente Amersfoort · Restricted · 1 lots · 368027
Type
Works
45233120
Estimated value
€ 25M
estimated
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

The Municipality of Amersfoort will tender the design phase and construction of a new connection road near Vathorst. The project includes both technical management and the physical realization of the road and associated infrastructure.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€25,000,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

Design and construction of a new connection road of approximately 3 kilometers, including an underpass and modification of the A1, executed as a two-phase contract.

The Municipality of Amersfoort intends to construct a new connection road of approximately 3 kilometers, including an underpass at the level of the Zevenhuizerstraat and a modification of the A1 on- and off-ramp near Bunschoten. The road must form a high-quality connection between the Vathorst district and the N199 and the on- and off-ramp of the A1 motorway, and also serves to provide access to the new Bovenduist district.

45233120€ 25MWorks
1Design and construction of new Vathorst connection road€25,000,000

02Strategic insight

Strategic insight · AI analysis
Ensure a strong substantiation of the reference projects to pass the selection phase. Prepare a high-quality bid design as an integral part of the tender. Take the Team-Value method into account during the further procedure.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The assignment is executed as a two-phase contract.Important
Bidders must submit a bid design as part of the bid.Important
Selection takes place via the Team-Value method with individual inquiries.Important
The contract value is indicative and may vary between € 20,000,000.00 and € 30,000,000.00.Important

04Can I take part?

Technical · 1
Experience with comparable infrastructure projects.Technical
Financial · 1
Compliance with financial capacity requirements.Financial
Other · 1
Compliance with sustainability requirements.Other

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

€25,000,000

07Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9692×
2Van Gelder BVSME9553×
3Boskalis Nederland B.V.SME9469×
4BAM Infra B.V.SME9377×
5NTP B.V.SME9322×
6Heijmans Infra B.V.SME9265×

08Tender documents

TN512130 - EF04 Vooraankondiging die alleen ter informatie wordt gebruikt - algemene richtlijn 20250217164852pdfFeb 19, 2025 · 9 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the exact scope and purpose of the new connection road?
The assignment concerns the construction of a new connection road of approximately 3 kilometers. This road forms a connection between the Vathorst district and the N199 and the on- and off-ramp of the A1 motorway. Additionally, the project includes an underpass at the level of the Zevenhuizerstraat, a modification of the A1 on- and off-ramp near Bunschoten, and the provision of access to the new Bovenduist district.
In which phases is the assignment divided?
The assignment is offered as a two-phase contract. Phase 1 focuses on project management, project control, contract management, environmental management, and technical management (such as the preparation of preliminary and final designs). Phase 2 also includes project management, project control, and environmental management, including traffic management.
Which specific works fall under technical and environmental management?
Technical management includes the preparation of the preliminary and final design, the preparation of a health and safety (V&G) plan, the coordination of third-party works, and the preparation of works on cables and pipelines. Environmental management includes obtaining permits, environmental communication, traffic management, and stakeholder management with the Municipality of Amersfoort, Municipality of Bunschoten, Province of Utrecht, and Rijkswaterstaat.

Automatically compiled from the official tender data and documents.