Maintenance of sewage pumping stations

Gemeente Alphen aan den Rijn · Open · 1 lots · 330023
Type
Services
90430000
Estimated value
€ 1,10M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Alphen aan den Rijn wishes to outsource the daily maintenance of approximately 175 wet-well sewage pumping stations, one dry-well pumping station, 1,690 mini-pumping stations, 184 central distribution boxes, 4 surface water pumping stations, 32 overflows with communication, and 10 grit chambers for a period of 2 to 4 years. The focus lies on renewing the controls and communication of the entire system. The tender is divided into two lots: main sewage pumping stations and mini-sewage pumping stations. It concerns an open procedure for services, without a CPV code. The contracting authority is looking for a contractor with experience in maintenance, control systems, and communication infrastructure for sewage installations, who can deliver within the specified timeframe and ensure the continuity of water drainage.

Services · Open · European procedure

European
Contracting authority
Contract type
Services
Open
Estimated value
€1,100,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 90ServicesEU tendersewage pumping stationsmaintenancecontrol

01What is being requested

The Municipality of Alphen aan den Rijn wishes to outsource the daily maintenance of approximately 175 wet-well sewage pumping stations, one dry-well pumping station, 1,690 mini-pumping stations, 184 central distribution boxes, 4 surface water pumping stations, 32 overflows with communication, and 10 grit chambers for a period of 2 to 4 years. The focus lies on renewing the controls and communication of the entire system. The tender is divided into two lots: main sewage pumping stations and mini-sewage pumping stations. It concerns an open procedure for services, without a CPV code. The contracting authority is looking for a contractor with experience in maintenance, control systems, and communication infrastructure for sewage installations, who can deliver within the specified timeframe and ensure the continuity of water drainage.

The Municipality of Alphen aan den Rijn manages approximately 175 wet-well sewage pumping stations, one (1) dry-well sewage pumping station, approx. 1,690 mini-pumping stations, 184 central distribution boxes, 4 surface water pumping stations, 32 overflows with communication, and 10 Bergbezinkbakken (BBB). With this tender, the Municipality wishes to outsource the daily maintenance of these installations for the next two (2) to four (4) years, whereby the focus during this period lies on renewing the controls and communication of the total system. The Municipality is looking for contractors f

90430000€ 1,10MServices
1Maintenance of sewage pumping stations€1,100,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€1,100,000

04Likely competitors

#Likely bidderFitWins
1Vandervalk+degroot B.V.SME10066×
2PreZero Riool Services B.V.SME10022×
3REMONDIS Smart Infra B.V.SME9929×
4vandervalk+degroot bvSME9837×
5Veeg- en Rioolbedrijf Adriaans BVSME9825×
6SITA Recycling Services Noord B.V.SME9448×

05Legal themes that may be relevant here

06Frequently asked questions

What exactly does the contract for the maintenance of the sewage pumping stations entail?
The contract concerns the daily maintenance of approximately 175 wet-well sewage pumping stations, one dry-well pumping station, 1,690 mini-pumping stations, 184 central distribution boxes, 4 surface water pumping stations, 32 overflows with communication, and 10 grit chambers. The focus lies on renewing the controls and communication of the total system.
What is the intended duration of the agreement?
The municipality wishes to outsource the daily maintenance of the mentioned installations for a period of 2 to 4 years.
Into which parts is the contract divided?
The tender is divided into two lots: Lot 1 concerns the main sewage pumping stations and Lot 2 concerns the mini-sewage pumping stations.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 214K
median
€ 466K
p75
€ 1,2 mln
€ 1,1 mln

Gegunde waarden in CPV 90 · diensten n=2216