ClosedWorksEuropeanCompetitive procedure with negotiation

Omega Quay Wall Europahaven

Havenbedrijf Rotterdam · Competitive procedure with negotiation · 1 lots · 399041
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Port of Rotterdam is requesting the realization and partial design of a deep-sea quay wall (≈1,455 m) and three berths for container ships at the Europahaven, Maasvlakte 1. The assignment includes design, construction of a 30 m high combi-wall, crane track, concrete capping beam, port furniture, dredging/excavation works, and land reclamation. The negotiated procedure also provides scope for a framework agreement for future phase 2 projects (berths 4 & 5). This technically intensive, yet concentrated in a single lot assignment, is of interest to specialized construction and engineering SME suppliers with experience in maritime infrastructure.

Works · Competitive procedure with negotiation · European procedure

European
Contracting authority
Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Port of Rotterdam is requesting the realization and partial design of a deep-sea quay wall (≈1,455 m) and three berths for container ships at the Europahaven, Maasvlakte 1. The assignment includes design, construction of a 30 m high combi-wall, crane track, concrete capping beam, port furniture, dredging/excavation works, and land reclamation. The negotiated procedure also provides scope for a framework agreement for future phase 2 projects (berths 4 & 5). This technically intensive, yet concentrated in a single lot assignment, is of interest to specialized construction and engineering SME suppliers with experience in maritime infrastructure.

Port of Rotterdam NV intends to contract a party for the realization and partial design of a deep-sea quay wall and three berths, suitable for future container ships, to replace the current quay of the Delta Terminal in the Europahaven, Maasvlakte 1 Rotterdam. The scope of the contract to be tendered consists of research and design activities and the realization of approximately 1,455 meters of quay wall (phase 1) with a retaining height of approximately 30 meters. The works primarily consist of design activities, site preparation, the driving and anchoring of a combi-wall, the installation of

45000000Works
1Omega Quay Wall Europahaven

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Van Hattum & Blankevoort N.V.SME9819×
2Boskalis Nederland B.V.SME9769×
3Van Oord Nederland BVSME9719×
4KWS Infra B.V.SME9692×
5Ploegam B.V.SME9522×
6BAM Infra B.V.SME9477×

05Legal themes that may be relevant here

06Frequently asked questions

What is the exact scope of the works for the Omega Quay Wall Europahaven?
The assignment includes the research and design work and the realization of approximately 1,455 meters of quay wall (phase 1) with a retaining height of approximately 30 meters. The works include the driving and anchoring of a combi-wall, the installation of a crane track, a concrete capping beam, port furniture, dredging and excavation works, and the reclamation of a site on the west side.
In addition to the quay wall, will a framework agreement also be concluded?
Yes, Port of Rotterdam NV intends to conclude a framework agreement with the party that realizes the quay wall. Under this framework agreement, projects can be requested for the redevelopment of the Maritime Infrastructure on the Delta Peninsula.
Which optional projects can be carried out under the framework agreement?
The optional projects include phase 2a: the design and realization of a quay wall and berth 4 with a length of approximately 600 meters, and phase 2b: the design and realization of a quay wall and berth 5 with a length of approximately 550 meters.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159