Offshore Grid NL - Offshore Route Survey activities (non-UXO)
TenneT TSO B.V. is seeking a service provider for offshore route survey activities in the Dutch North Sea, specifically for the areas Hollandse Kust (west) Beta, Ten noorden van de Waddeneilanden, IJmuiden Ver Alpha, and IJmuiden Ver Beta. The tender is part of the Wet Windenergie op Zee and the Roadmap 2030, which regulates the expansion of offshore wind energy until 2030. The contracting authority requires a detailed route survey without UXO (Unexploded Ordnance) risks, including technical analysis, map production, and reporting. The service provider must comply with safety and environmental standards, possess experience with offshore infrastructure and marine surveying, and be capable of delivering within the specified timelines. The procedure is a competitive procedure with negotiation, allowing for a flexible price and delivery structure.
Services · Competitive procedure with negotiation · European procedure
01What is being requested
TenneT TSO B.V. is seeking a service provider for offshore route survey activities in the Dutch North Sea, specifically for the areas Hollandse Kust (west) Beta, Ten noorden van de Waddeneilanden, IJmuiden Ver Alpha, and IJmuiden Ver Beta. The tender is part of the Wet Windenergie op Zee and the Roadmap 2030, which regulates the expansion of offshore wind energy until 2030. The contracting authority requires a detailed route survey without UXO (Unexploded Ordnance) risks, including technical analysis, map production, and reporting. The service provider must comply with safety and environmental standards, possess experience with offshore infrastructure and marine surveying, and be capable of delivering within the specified timelines. The procedure is a competitive procedure with negotiation, allowing for a flexible price and delivery structure.
The law 'Wind energy at Sea (Windenergie op Zee)' of July 1, 2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO B.V. (hereafter Client) is the offshore grid operator. In this role the Client is responsible for engineering, procurement, installation, construction and operation of the connections between the offshore wind farms (through a converter platform) to the onshore network. On March 27 2018 the Dutch Ministry of Economic Affairs and Climate Policy introduced 'Roadmap windenergie op zee 2030', hereafter Roadmap 2030. The Roadmap 2030 designa
02Outcome
Next Geosolutions Éurope SpA
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What is the purpose of the offshore route survey activities?
For which specific wind energy areas are the surveys being conducted?
What is the scope of the requested survey works?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 250K
€ 550K
€ 1,1 mln
Gegunde waarden in CPV 76 · diensten n=19