ClosedWorksEuropeanSME-friendlyCompetitive procedure with negotiation

Offshore Grid NL - 525 kV DC Cable & Installation of Dutch 2 GW Projects

TenneT TSO B.V. · Competitive procedure with negotiation · 5 lots · 301131
Type
Works
45314300
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

TenneT TSO has a competitive procedure with negotiation for the execution of five 2-GW grid connections. The contract includes design, engineering, production, delivery, project management, and installation of 525 kV DC cables, including subsea and land jointing. The projects IJmuiden-Ver Alpha, Beta, Gamma and Nederwiek 1 and 2 require an integrated approach to offshore, nearshore, and inshore works, with ISD dates up to 2030. The tender requires a high technical level, experience with large DC cable projects, and a proven track record in complex maritime installations. The contracting authority expects a complete supply chain, from concept to operational handover, with strict safety and quality standards.

Works · Competitive procedure with negotiation · European procedure · SME-friendly

SME-friendlyEuropean
Contracting authority
Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
5
5 lots
Main CPV code
Location
Arnhem
CharacteristicsCPV 45WorksSME-friendlyEU tenderOffshore grid525kV DC cableTenneT

01What is being requested

TenneT TSO has a competitive procedure with negotiation for the execution of five 2-GW grid connections. The contract includes design, engineering, production, delivery, project management, and installation of 525 kV DC cables, including subsea and land jointing. The projects IJmuiden-Ver Alpha, Beta, Gamma and Nederwiek 1 and 2 require an integrated approach to offshore, nearshore, and inshore works, with ISD dates up to 2030. The tender requires a high technical level, experience with large DC cable projects, and a proven track record in complex maritime installations. The contracting authority expects a complete supply chain, from concept to operational handover, with strict safety and quality standards.

The scope of work for the intended contracts includes design, engineering, production, delivery, project management, offshore-, nearshore- and inshore installation of 525kV DC cables and all jointing works in submarine and land sections for the following five 2GW grid connections: Project IJmuiden-Ver Alpha (IV1) (ISD 2029), IJmuiden-Ver Beta (IV2) (ISD 2028), IJmuiden-Ver Gamma (IV3) (ISD 2029), Nederwiek 1 (IV4) (ISD-2030 and Nederwiek 2 (IV5) (ISD 2030).

45314300Works
1Lot 1
2Lot 2
3Lot 3
4Lot 4
5Lot 5

02Outcome

Awarded

Prysmian Powerlink S.r.l.

03Breakdown by lot

Lot 1n/a
Lot 2n/a
Lot 3n/a
Lot 4n/a
Lot 5n/a

Per-lot values not published — bars show only the lot breakdown.

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Bidders in this segment

#Likely bidderFitWins
1BAM Infra B.V.SME9677×
2ENGIE Infra & Mobility B.V.SME9469×
3Heijmans Infra B.V.SME9265×
4SPIE Nederland B.V.SME9123×
5Croonwolter&dros B.V.SME9125×
6Dynniq Nederland B.V.SME8111×

07Legal themes that may be relevant here

08Frequently asked questions

What is the scope of work for the 2 GW grid connections?
The contract includes design, engineering, production, delivery, project management, and the offshore, nearshore, and inshore installation of 525kV DC cables, including all jointing works in both subsea and land sections.
Which specific projects does this tender concern?
It concerns five 2GW grid connections: Project IJmuiden-Ver Alpha (IV1), IJmuiden-Ver Beta (IV2), IJmuiden-Ver Gamma (IV3), Nederwiek 1 (IV4) and Nederwiek 2 (IV5).
What are the expected commissioning dates (ISD) for the mentioned projects?
The expected ISD for the projects is as follows: IJmuiden-Ver Beta (2028), IJmuiden-Ver Alpha (2029), IJmuiden-Ver Gamma (2029), Nederwiek 1 (2030) and Nederwiek 2 (2030).

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159