ClosedWorksEuropeanCompetitive dialogue

New construction VMBO AOC Oost in Doetinchem

Stichting AOC Oost-Nederland · Competitive dialogue · 105883
Type
Works
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

New construction VMBO AOC Oost Doetinchem – Design, Built, Maintain & Operate (DBMO) for a 7,500 m² educational building with 8,500 m² of outdoor area. The procedure is a competitive dialogue, UAV-GC 2005 clause. AOC provides the existing working building at Gildenbroederslaan. Closing and start phase: week 45 2017, execution starts April 2018, delivery May 2019.

Works · Competitive dialogue · European procedure

European
Contracting authority
Contract type
Works
Competitive dialogue
Estimated value
Estimate not published
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksEU tender

01What is being requested

New construction VMBO AOC Oost Doetinchem – Design, Built, Maintain & Operate (DBMO) for a 7,500 m² educational building with 8,500 m² of outdoor area. The procedure is a competitive dialogue, UAV-GC 2005 clause. AOC provides the existing working building at Gildenbroederslaan. Closing and start phase: week 45 2017, execution starts April 2018, delivery May 2019.

Stichting AOC Oost-Nederland is working on the development of a new educational building for Pre-vocational Secondary Education (VMBO) in the fields of nature, food, and living environment.r/n/r/nAOC Oost trains the people who will create the green society. The professionals who ensure healthy food, who color the landscape, or who provide direction to recycling. Because tomorrow is green. r/nIn the familiar world of AOC Oost, you therefore learn today how that can happen in the future. You smell the flowers, feel the animals, and taste the food. You work with new techniques and discover new po

Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Buko Bouwsystemen Vuren B.V. potentialSME36
2De Geus Bouw potentialUnknown36
3Willems Uden Technische Installaties potentialUnknown36
4Gabriëls Elektro B.V. potentialSME36
5Ector Hoogstad Architecten B.V. potentialSME36
6Kreunen Bouw Lochem B.V. potentialSME36

05Legal themes that may be relevant here

06Frequently asked questions

What is the size of the new educational building?
The new educational building has a size of approximately 7,500 m² GFA and features 8,500 m² of outdoor area.
What does the Design, Built, Maintain & Operate (DBMO) agreement entail?
The agreement includes the design, engineering, realization, maintenance, and operation of the project. The operation component specifically consists of the cleaning services for the building in question.
On which contract conditions is the agreement based?
The framework agreement is drawn up based on the UAV-GC 2005.
What is the indicative schedule for execution and delivery?
Execution of the project starts in April 2018, with the intended delivery in May 2019.