AwardedWorksEuropeanRestricted

New construction VC Westergouwe with KC De Ontdekkingsreizigers and residential tower

Gemeente Gouda · Restricted · 1 lots · 275996
Type
Works
45210000
Estimated value
€ 24M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Gouda intends to realize the new construction project VC Westergouwe, including a child centre 'De Ontdekkingsreizigers' and a residential tower, in the Westergouwe district. The project concerns an extensive construction assignment with multiple functions: a facilities cluster for education, healthcare, and recreation, a child centre for children up to 12 years old, and a residential tower for 120–150 homes. The contracting authority requires an integrated approach, in which construction quality, sustainability, accessibility, and safety are central. The procurement follows a non-public procedure, whereby the selection of a suitable contractor takes place on the basis of technical and financial competence. The contractor must have experience with similar multifunctional construction projects, be capable of providing a detailed project plan, and must comply with Dutch regulations regarding construction, environment, and social inclusion. The completion period is 36 months, with a total budget limit of €45 million. The municipality expects transparent communication, regular progress reports, and a clear risk management strategy.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€23,917,850
awarded value
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
GOUDA
CharacteristicsCPV 45WorksEU tendernew constructionVC WestergouweKC De Ontdekkingsreizigers

01What is being requested

The Municipality of Gouda intends to realize the new construction project VC Westergouwe, including a child centre 'De Ontdekkingsreizigers' and a residential tower, in the Westergouwe district. The project concerns an extensive construction assignment with multiple functions: a facilities cluster for education, healthcare, and recreation, a child centre for children up to 12 years old, and a residential tower for 120–150 homes. The contracting authority requires an integrated approach, in which construction quality, sustainability, accessibility, and safety are central. The procurement follows a non-public procedure, whereby the selection of a suitable contractor takes place on the basis of technical and financial competence. The contractor must have experience with similar multifunctional construction projects, be capable of providing a detailed project plan, and must comply with Dutch regulations regarding construction, environment, and social inclusion. The completion period is 36 months, with a total budget limit of €45 million. The municipality expects transparent communication, regular progress reports, and a clear risk management strategy.

The Contracting Authority aims to realize the new construction Facilities Cluster (hereinafter: ‘VC’) Westergouwe with Child Centre (hereinafter: ‘KC’) De Ontdekkingsreizigers and Residential Tower in the new-build district Westergouwe in Gouda.

45210000Works
1Lot 1

02Outcome

Awarded

Slokker Bouwgroep B.V.

Award value
€23,917,850

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Heijmans Infra B.V.SME9765×
2Van Gelder BVSME9753×
3KWS Infra B.V.SME9692×
4BAM Infra B.V.SME9677×
5Boskalis Nederland B.V.SME9669×
6Dura Vermeer Infra Regionale Projecten BVSME9658×

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the new construction project in Westergouwe?
The project includes the realization of a facilities cluster (VC) with a child centre (KC) 'De Ontdekkingsreizigers' for children up to 12 years old and a residential tower with 120 to 150 homes.
What is the expected completion period for the construction assignment?
The total completion period for the realization of the facilities cluster, the child centre, and the residential tower is 36 months.
What are the main functional components of the assignment?
The assignment entails the construction of a facilities cluster for education, healthcare, and recreation, a child centre, and a residential tower.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 24 mln

Gegunde waarden in CPV 45 · werken n=3159