New construction Stevenshofcomplex Leiden
European non-public tender for the new construction of the Stevenshofcomplex in Leiden via construction team partnership. The contract includes demolition and new construction of approximately 4,866 m2 GFA, divided into building and installation technical lots.
Works · Restricted · European procedure
01What is being requested
The project concerns the replacement new construction of the Stevenshof school complex in Leiden, consisting of demolition and new construction of approximately 4,866 m2 GFA. The contract is to be executed in construction team partnership from the Final Design (DO) phase for both building and installation technical works.
The realization of a building with two primary schools, a gymnasium, and childcare.
02Breakdown by lot
Per-lot values not published — bars show only the lot breakdown.
03Strategic insight
Focus on the construction team methodology; the contracting authority expects an active contribution to the design (manufacturability, financial feasibility, and planning) from the DO phase onwards. Ensure a strong Plan of Approach, as this carries the heaviest weight at 60% during the award phase. Ensure that all certifications (ISO, VCA, SCL, CO2-Prestatieladder) and insurance policies are immediately available to meet the strict suitability requirements.
04Points of attention
05Can I take part?
06Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Award criteria
The award criterion is shaped by the following sub-award criteria: Price (tail and advisory costs) (40%)Plan of Approach (60%)
08Process & timeline
09Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
10Likely competitors
11Tender documents
12Legal themes that may be relevant here
13Frequently asked questions
What is the content of the assignment?
Which suitability requirements must a bidder meet?
What is the content of the installations component?
Automatically compiled from the official tender data and documents.