ClosedWorksEuropeanRestrictedGreen

New Construction Recreation Centre De Fakkel Ridderkerk

Type
Works
45212212
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

New construction of a recreation centre in Ridderkerk according to a UAV-gc Design & Build contract type. The project focuses on a sustainable, all-electric complex of approximately 8,900 m2 GFA.

Works · Restricted · European procedure

Sustainability countsEuropean
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

Design, development, and realization of a recreation centre based on a UAV-gc agreement (Design & Build). The complex comprises approximately 8,900 m2 GFA with functions such as a central hall, swimming pools, sports hall, and gym.

This project comprises the design, development, and realization of a recreation centre based on a UAV-gc agreement (Design & Build). The requirements specification, which will be sent along with the invitation to tender in the next phase of the procurement (award phase), will include, in addition to the Program of Requirements, an integration study and a concept VD floor plan. The functional design will therefore be provided in its basic form. It is intended that the new recreation centre will completely replace the existing complex at the same location. Since the starting point is to keep th

45212212Works
1New Construction Recreation Centre De Fakkel Ridderkerk

02Strategic insight

Strategic insight · AI analysis
Ensure an integrated team where cooperation and organization are central during the presentation. If relying on a Third Party, provide full proof of financial and technical availability. Pay close attention to the permit requirement which lies with the bidder.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
The contract is a Design & Build tender.Important
The existing complex must remain in use during the new construction.Important
No WKO may be applied due to the location.Important
The system must be temporarily hybrid due to grid congestion.Important
Incorrect or misleading evidence can lead to a fine of € 20,000.00.Important
When relying on a Third Party, convincing proof must be provided regarding the availability of the resources.Important

04Can I take part?

Financial · 1
Financial and economic standingFinancial
Technical · 1
Technical or professional abilityTechnical
Professional capability · 1
Professional competenceProfessional capability
Other · 2
Certificates (ISO certification and VCA certification)Other
Dutch languageOther

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9992×
2BAM Infra B.V.SME9977×
3Combinatie Heijmans - SWARCOUnknown9973×
4Van Gelder BVSME9953×
5Heijmans Infra B.V.SME9865×
6Dura Vermeer Infra Regionale Projecten BVSME9858×

08Tender documents

Nota van inlichtingen 2025-11-24-1pdfNov 24, 2025 · 18 KB
Selectieleidraad 061125pdfNov 6, 2025 · 17776 KB
TN554282 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20251029130530pdfOct 30, 2025 · 10 KB
uea_554282_20251029122821pdfOct 30, 2025 · 377 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the nature of the agreement for this project?
The contract comprises the design, development, and realization of a recreation centre based on a UAV-gc agreement (Design & Build).
How will the realization of the new recreation centre be carried out?
The realization takes place in phases. The indoor pool will be built on the current location of the outdoor pools. Upon completion, the old building will be demolished to realize the outdoor pools there.
What information is provided for the functional design?
The requirements specification in the award phase contains, in addition to the Program of Requirements, an integration study and a concept VD floor plan, whereby the functional design is provided in its basic form.
Will the current swimming pools and the sports hall remain available during construction?
Yes, the existing swimming pools and the sports hall will remain open during the new construction by swapping the location of the indoor pool and the outdoor pools.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159