New Construction Recreation Centre De Fakkel Ridderkerk
New construction of a recreation centre in Ridderkerk according to a UAV-gc Design & Build contract type. The project focuses on a sustainable, all-electric complex of approximately 8,900 m2 GFA.
Works · Restricted · European procedure
01What is being requested
Design, development, and realization of a recreation centre based on a UAV-gc agreement (Design & Build). The complex comprises approximately 8,900 m2 GFA with functions such as a central hall, swimming pools, sports hall, and gym.
This project comprises the design, development, and realization of a recreation centre based on a UAV-gc agreement (Design & Build). The requirements specification, which will be sent along with the invitation to tender in the next phase of the procurement (award phase), will include, in addition to the Program of Requirements, an integration study and a concept VD floor plan. The functional design will therefore be provided in its basic form. It is intended that the new recreation centre will completely replace the existing complex at the same location. Since the starting point is to keep th
02Strategic insight
Ensure an integrated team where cooperation and organization are central during the presentation. If relying on a Third Party, provide full proof of financial and technical availability. Pay close attention to the permit requirement which lies with the bidder.
03Points of attention
04Can I take part?
05Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
07Likely competitors
08Tender documents
09Legal themes that may be relevant here
10Frequently asked questions
What is the nature of the agreement for this project?
How will the realization of the new recreation centre be carried out?
What information is provided for the functional design?
Will the current swimming pools and the sports hall remain available during construction?
Automatically compiled from the official tender data and documents.