ClosedWorksEuropeanRestricted

New construction Kompaan College in Vorden, lot 2

Stichting Achterhoek VO · Restricted · 1 lots · 292908
Type
Works
45300000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the new construction of the Kompaan College on lot 2 in Vorden, organized by Stichting Achterhoek VO. The project includes the design, construction, and delivery of a fully functional school building, including classrooms, sports facilities, offices, and supporting infrastructure. The contracting authority aims for a sustainable, energy-efficient construction that complies with current Dutch building and safety standards, including accessibility for people with disabilities. The tender is non-public, meaning the selection procedure is limited to a predefined group of certified companies. The project duration is planned for 18 to 24 months, with a strict delivery deadline. The contracting authority emphasizes quality, safety, cost control, and transparent communication throughout the entire project.

Works · Restricted · European procedure

European
Contracting authority
Gelderland
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Doetinchem, Gelderland
CharacteristicsCPV 45WorksEU tendernew constructioncollegeVorden

01What is being requested

The tender concerns the new construction of the Kompaan College on lot 2 in Vorden, organized by Stichting Achterhoek VO. The project includes the design, construction, and delivery of a fully functional school building, including classrooms, sports facilities, offices, and supporting infrastructure. The contracting authority aims for a sustainable, energy-efficient construction that complies with current Dutch building and safety standards, including accessibility for people with disabilities. The tender is non-public, meaning the selection procedure is limited to a predefined group of certified companies. The project duration is planned for 18 to 24 months, with a strict delivery deadline. The contracting authority emphasizes quality, safety, cost control, and transparent communication throughout the entire project.

New construction Kompaan College in Vorden, lot 2

45300000Works
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME9334×
2Croonwolter&dros B.V.SME9225×
3Hegeman Bouw & Infra B.V.SME9131×
4Heijmans Utiliteit B.V.SME8927×
5BINX Smartility B.V.SME8827×
6Kernbouw B.V.SME8211×

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of the contract for the new construction of the Kompaan College?
The contract concerns the new construction of the Kompaan College on lot 2 in Vorden, focusing on the design, construction, and delivery of a fully functional school building, including classrooms, sports facilities, offices, and supporting infrastructure.
What is the expected project duration for the construction of the school building?
The project duration for the realization of the new construction is planned for a period of 18 to 24 months, with a strict delivery deadline applicable.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159