New Construction of Kinder- en Jongerencentrum Leijpark
Stichting Onderwijscentrum Leijpark is using a non-public procedure for the new construction of a Kinder- en Jongerencentrum, focused on special education. The project combines design and realization under the UAV-gc (2005), ensuring the contracting authority is intensively involved in the design process. The schedule is ambitious, with tight deadlines and an integrated approach encompassing both construction and the functional requirements of a special education institution. The contracting authority requires flexible, transparent cooperation in which changes and feedback can be processed quickly. The tender requires an experienced construction partner with both technical and pedagogical insight, capable of realizing a high-quality, safe, and accessible building within the specified timeframes.
Works · Restricted · European procedure
01What is being requested
Stichting Onderwijscentrum Leijpark is using a non-public procedure for the new construction of a Kinder- en Jongerencentrum, focused on special education. The project combines design and realization under the UAV-gc (2005), ensuring the contracting authority is intensively involved in the design process. The schedule is ambitious, with tight deadlines and an integrated approach encompassing both construction and the functional requirements of a special education institution. The contracting authority requires flexible, transparent cooperation in which changes and feedback can be processed quickly. The tender requires an experienced construction partner with both technical and pedagogical insight, capable of realizing a high-quality, safe, and accessible building within the specified timeframes.
The assignment concerns the design and realization of a school for special education. Due to the integration of design and realization, the underlying agreement is based on the UAV-gc (2005). The contracting authority wishes to be intensively involved in the design process. It is an ambitious project schedule.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the nature of the agreement for this project?
What does the cooperation with the contracting authority look like during the design process?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159