AwardedServicesEuropeanRestricted

New construction IKC Het Kristal in Dordrecht

Type
Services
Estimated value
€ 350K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Onderwijsstichting H3O is looking for an integrated design team for the new construction of IKC Het Kristal in Dordrecht. The project includes a primary school, a gymnasium, a daycare center, and after-school care, with a total area of approximately 3,000 m² on a relatively small plot. The team must represent at least the disciplines of architecture, installation consultancy, structural consultancy, and building physics, and be capable of delivering a fully coordinated, sustainable, and multifunctional design. The procedure is non-public and concerns a service contract. The contracting authority expects an integrated approach in which all disciplines work together to optimize the building, technical, and energy performance, taking into account the limited space and the various educational functions.

Services · Restricted · European procedure

European
Contract type
Services
Restricted
Estimated value
€350,000
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVServicesEU tenderintegrated design teamsustainablemultifunctional

01What is being requested

Onderwijsstichting H3O is looking for an integrated design team for the new construction of IKC Het Kristal in Dordrecht. The project includes a primary school, a gymnasium, a daycare center, and after-school care, with a total area of approximately 3,000 m² on a relatively small plot. The team must represent at least the disciplines of architecture, installation consultancy, structural consultancy, and building physics, and be capable of delivering a fully coordinated, sustainable, and multifunctional design. The procedure is non-public and concerns a service contract. The contracting authority expects an integrated approach in which all disciplines work together to optimize the building, technical, and energy performance, taking into account the limited space and the various educational functions.

For the new construction of IKC Het Kristal, Onderwijsstichting H3O is looking for an integrated design team, in which at least the disciplines of architecture, installation consultancy, structural consultancy, and building physics are represented. One team that is capable of achieving a fully coordinated, sustainable, and multifunctional design.

Services

02Outcome

Awarded

BDG Architecten Ingenieurs Zwolle B.V.

Award value
€350,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Van den Berg Architecten B.V. potentialSME40
2BM Utiliteit B.V. potentialSME40
3BDG Architecten Ingenieurs Zwolle B.V. potentialSME40
4De Kok Bouwgroep B.V. potentialSME40
5Winters Bouw & Ontwikkeling BV potentialSME40
6LKSVDD architecten potentialUnknown39

06Frequently asked questions

What is the scope of the project for the new construction of IKC Het Kristal?
The project concerns the new construction of IKC Het Kristal, which, according to current insights, will comprise a total of approximately 3,000 m² GFA.
Which functions will be housed in the new IKC?
IKC Het Kristal will house a primary school, a gymnasium, a daycare center, and after-school care.
Which disciplines must be represented in the integrated design team?
The integrated design team must represent at least the disciplines of architecture, installation consultancy, structural consultancy, and building physics.
What is the goal of the cooperation within the design team?
The team must be capable of achieving a fully coordinated, sustainable, and multifunctional design for the various educational functions on a relatively small plot.

Automatically compiled from the official tender data and documents.