New construction IKC Het Kristal in Dordrecht
Onderwijsstichting H3O is looking for an integrated design team for the new construction of IKC Het Kristal in Dordrecht. The project includes a primary school, a gymnasium, a daycare center, and after-school care, with a total area of approximately 3,000 m² on a relatively small plot. The team must represent at least the disciplines of architecture, installation consultancy, structural consultancy, and building physics, and be capable of delivering a fully coordinated, sustainable, and multifunctional design. The procedure is non-public and concerns a service contract. The contracting authority expects an integrated approach in which all disciplines work together to optimize the building, technical, and energy performance, taking into account the limited space and the various educational functions.
Services · Restricted · European procedure
01What is being requested
Onderwijsstichting H3O is looking for an integrated design team for the new construction of IKC Het Kristal in Dordrecht. The project includes a primary school, a gymnasium, a daycare center, and after-school care, with a total area of approximately 3,000 m² on a relatively small plot. The team must represent at least the disciplines of architecture, installation consultancy, structural consultancy, and building physics, and be capable of delivering a fully coordinated, sustainable, and multifunctional design. The procedure is non-public and concerns a service contract. The contracting authority expects an integrated approach in which all disciplines work together to optimize the building, technical, and energy performance, taking into account the limited space and the various educational functions.
For the new construction of IKC Het Kristal, Onderwijsstichting H3O is looking for an integrated design team, in which at least the disciplines of architecture, installation consultancy, structural consultancy, and building physics are represented. One team that is capable of achieving a fully coordinated, sustainable, and multifunctional design.
02Outcome
BDG Architecten Ingenieurs Zwolle B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
05Bidders in this segment
06Frequently asked questions
What is the scope of the project for the new construction of IKC Het Kristal?
Which functions will be housed in the new IKC?
Which disciplines must be represented in the integrated design team?
What is the goal of the cooperation within the design team?
Automatically compiled from the official tender data and documents.