New Construction Gilde Opleidingen Roermond

Stichting Gilde Opleidingen · Open · 1 lots · 246551
Type
Works
45214500
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Gilde Opleidingen is seeking a single executing party for an integrated Engineering, Build and Maintain (UAV-GC) agreement for the new educational building to be constructed at Marathonlaan in Roermond. The tender is public and follows the Best Value methodology. The contracting authority intends to conclude a contract by the end of April 2022 at the latest, covering the full engineering, construction, and a 15-year performance-based maintenance period. The party must have experience with integrated contract forms, project management, quality control, and maintenance management. The agreement requires a holistic approach in which design, construction, and maintenance align seamlessly, with clear performance indicators and a focus on cost-efficiency and sustainability.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
16:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Roermond
CharacteristicsCPV 45WorksEU tenderEngineering Build MaintainUAV-GCBest Value

01What is being requested

Stichting Gilde Opleidingen is seeking a single executing party for an integrated Engineering, Build and Maintain (UAV-GC) agreement for the new educational building to be constructed at Marathonlaan in Roermond. The tender is public and follows the Best Value methodology. The contracting authority intends to conclude a contract by the end of April 2022 at the latest, covering the full engineering, construction, and a 15-year performance-based maintenance period. The party must have experience with integrated contract forms, project management, quality control, and maintenance management. The agreement requires a holistic approach in which design, construction, and maintenance align seamlessly, with clear performance indicators and a focus on cost-efficiency and sustainability.

The contracting authority intends to conclude one agreement with one executing party by the end of April 2022 at the latest, covering both the engineering, new construction, and the performance-based installation maintenance for a period of 15 years for the educational building to be realized at Marathonlaan in Roermond, based on the integrated contract form Engineering, Build and Maintain (UAV-GC) according to the Best Value methodology.

45214500Works
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9765×
2BINX Smartility B.V.SME9627×
3BAM Bouw en Techniek bvSME9434×
4Den Ouden Aannemingsbedrijf B.V.SME9223×
5Croonwolter&dros B.V.SME9125×
6Heijmans Utiliteit B.V.SME9027×

05Tender documents

TN336927 - SF01 Vooraankondiging 20211209151836pdfDec 11, 2021 · 17 KB
Vooraankondiging nieuwbouw Gilde Opleidingen_EA_HV2108pdfDec 11, 2021 · 276 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the assignment for the new construction in Roermond?
The assignment concerns an integrated agreement for the engineering, the new construction, and the performance-based installation maintenance of the educational building at Marathonlaan.
Which contract form and methodology are used for this assignment?
The assignment is to be executed based on an integrated Engineering, Build and Maintain (UAV-GC) contract according to the Best Value methodology.
What is the intended duration of the maintenance period?
In addition to the engineering and the new construction, the agreement includes a period of 15 years for the performance-based installation maintenance.
When is the agreement intended to be concluded?
The contracting authority intends to conclude the agreement by the end of April 2022 at the latest.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159