ClosedWorksEuropeanCompetitive procedure with negotiation

New Construction Filter Building PS Sellingen

N.V. Waterbedrijf Groningen · Competitive procedure with negotiation · 359583
Type
Works
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the complete new construction of the GF02 Sellingen filter building for N.V. Waterbedrijf Groningen. The project includes a multi-storey building with a flat roof, in which the new water line and rinse water line will be realized, with the exception of the sludge buffers and sand silo. Additionally, two circular sludge buffers with stairs for storing sludge and a sand silo between these buffers will be constructed. A gas flare installation for capturing, processing, storing, and flaring methane gas is part of the project. The procedure is a competitive procedure with negotiation, in which technical, safety, and environmental requirements must be strictly adhered to. The contractor must comply with Dutch regulations for water infrastructure, construction safety, and emission management, and must submit detailed drawings, material choices, and an execution plan.

Works · Competitive procedure with negotiation · European procedure

European
Contracting authority
Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
23:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksEU tenderfilter buildingsludge buffersand silo

01What is being requested

The tender concerns the complete new construction of the GF02 Sellingen filter building for N.V. Waterbedrijf Groningen. The project includes a multi-storey building with a flat roof, in which the new water line and rinse water line will be realized, with the exception of the sludge buffers and sand silo. Additionally, two circular sludge buffers with stairs for storing sludge and a sand silo between these buffers will be constructed. A gas flare installation for capturing, processing, storing, and flaring methane gas is part of the project. The procedure is a competitive procedure with negotiation, in which technical, safety, and environmental requirements must be strictly adhered to. The contractor must comply with Dutch regulations for water infrastructure, construction safety, and emission management, and must submit detailed drawings, material choices, and an execution plan.

Project description/description of works/services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and services/supplies/works and

Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Witteveen+Bos Raadgevende ingenieurs B.V. potentialSME39
2Van Hattum & Blankevoort N.V. potentialSME35
3VBK Schadenberg B.V. potentialSME32
4Schot Infra B.V. potentialSME32
5GEA Westfalia Separator Nederland B.V. potentialSME31
6SEW Energy B.V. potentialSME31

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of the new construction for the GF02 Sellingen filter building?
The contract includes the complete new construction of a multi-storey building with a flat roof, in which the new water line and rinse water line will be realized.
Which specific components are part of the scope of this project?
The scope consists of the filter building, two circular sludge buffers with stairs for sludge storage, a sand silo between the buffers, and a gas flare installation for processing, storing, and flaring methane gas.
What is the function of the gas flare installation within this project?
The gas flare installation is intended for capturing, processing, storing, and flaring methane gas.

Automatically compiled from the official tender data and documents.