AwardedWorksEuropeanSME-friendlyRestricted

New construction and renovation Henry Dunantweg

Stichting Scala College · Restricted · 2 lots · 216392
Type
Works
45000000
Estimated value
€ 11M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Scala College has a tender for the new construction and renovation of the school building and the sports hall at the Henry Dunantweg. The project includes building and installation works for the existing building, the new construction of a school building and a sports hall, and the landscaping of the surrounding grounds. The procedure is non-public, indicating a negotiated procedure. The contracting authority expects an integrated approach in which architecture, construction, installations, and landscape architecture align seamlessly. Emphasis is placed on safety, sustainability, accessibility, and compliance with Dutch building and environmental regulations. The contractor must provide a complete project plan, including a schedule, quality control, safety measures, and environmental management. Additionally, good coordination with the school and sports clubs is essential to ensure the continuity of education and sports activities.

Works · Restricted · European procedure · SME-friendly

SME-friendlyEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€11,325,512
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
2
2 lots
Main CPV code
Location
ALPHEN AAN DEN RIJN
CharacteristicsCPV 45WorksSME-friendlyEU tenderschool buildingsports hallrenovation

01What is being requested

Stichting Scala College has a tender for the new construction and renovation of the school building and the sports hall at the Henry Dunantweg. The project includes building and installation works for the existing building, the new construction of a school building and a sports hall, and the landscaping of the surrounding grounds. The procedure is non-public, indicating a negotiated procedure. The contracting authority expects an integrated approach in which architecture, construction, installations, and landscape architecture align seamlessly. Emphasis is placed on safety, sustainability, accessibility, and compliance with Dutch building and environmental regulations. The contractor must provide a complete project plan, including a schedule, quality control, safety measures, and environmental management. Additionally, good coordination with the school and sports clubs is essential to ensure the continuity of education and sports activities.

-Building works for the renovation of the existing building and the associated new construction of the school building and the sports hall;<|image>-Installation works for the renovation of the existing building and the associated new construction of the school building and the sports hall;-Landscaping of the grounds surrounding the new building.

45000000Works
1Lot 1
2Lot 2

02Outcome

Awarded

Du Prie Bouw & Ontwikkeling B.V.

Award value
€11,325,512

03Breakdown by lot

Lot 1n/a
Lot 2n/a

Per-lot values not published — bars show only the lot breakdown.

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Bidders in this segment

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME9734×
2Croonwolter&dros B.V.SME9725×
3BINX Smartility B.V.SME9627×
4Hegeman Bouw & Infra B.V.SME9531×
5Kernbouw B.V.SME9311×
6K_Dekker bouw & infra B.V.SME9222×

07Legal themes that may be relevant here

08Frequently asked questions

What does the scope of the works for the Henry Dunantweg include?
The assignment includes building and installation works for the renovation of the existing building and the new construction of the school building and the sports hall, as well as the landscaping of the grounds surrounding the new building.
Which aspects of the execution are essential for this project?
The execution requires an integrated approach of architecture, construction, installations, and landscape architecture, whereby the continuity of education and sports activities must be ensured through good coordination with the school and sports clubs.
Which components must be included in the project plan?
The project plan must contain a schedule, quality control, safety measures, and environmental management.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 16 mln

Gegunde waarden in CPV 45 · werken n=3159