New construction of double sports hall Zuidlaren
The Municipality of Tynaarlo intends to realize an energy-neutral double sports hall. The assignment includes the preparation of a preliminary and final design, including site layout, which complies with the usage requirements of NOC-NSF and relevant laws and regulations. Additionally, a phased circular demolition plan for the existing sports hall must be developed, and the permit application, including necessary investigations, must be managed. The design development is carried out within a construction team according to the DNR-2011, under a construction team agreement. The final realization will take place via a construction contract under the legal conditions of the UAV-GC2005. The procedure is non-public, allowing a limited number of certified contractors to participate.
Works · Restricted · European procedure
01What is being requested
The Municipality of Tynaarlo intends to realize an energy-neutral double sports hall. The assignment includes the preparation of a preliminary and final design, including site layout, which complies with the usage requirements of NOC-NSF and relevant laws and regulations. Additionally, a phased circular demolition plan for the existing sports hall must be developed, and the permit application, including necessary investigations, must be managed. The design development is carried out within a construction team according to the DNR-2011, under a construction team agreement. The final realization will take place via a construction contract under the legal conditions of the UAV-GC2005. The procedure is non-public, allowing a limited number of certified contractors to participate.
The assignment comprises the following main components/lines/outlines: • The preparation of a preliminary and a final design for an energy-neutral double sports hall to be realized, including site layout within the work area (see Annex 1 work area), whereby the design of the double sports hall must comply with usage requirements (including NOC-NSF) and laws and regulations; • Preparation of a (phased) circular demolition plan for the existing sports hall; • Managing the permit application including required investigations. The design development (Preliminary and Final design) is carried ou
02Outcome
BINX Smartility B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What are the main components of the assignment?
Which standards and conditions must the design comply with?
Which legal conditions apply to the execution?
Automatically compiled from the official tender data and documents.