CancelledWorksEuropeanRestricted

New construction of Daltonschool De Poolster

Stichting Openbaar Onderwijs Noord · Restricted · 244384
Type
Works
45000000
Estimated value
Not published
To deadline
-1640d
Dec 20, 2021 · 12:00
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Openbaar Onderwijs Noord has a non-public tender for the new construction of Daltonschool De Poolster, including a gymnasium. The project comprises a school building of approx. 1,893 m² GFA with capacity for approximately 300 students. The construction includes four classroom areas, a technology lab, educational learning areas, a play room, a classroom for early childhood education, office spaces, and support rooms. The associated gymnasium covers approx. 566 m² GFA. The assignment requires a modern, sustainable, and accessible learning environment, including facilities for sports and recreation. The tender focuses on a total area of 2,459 m² GFA, with an emphasis on functionality, safety, and energy efficiency. The procedure is non-public, allowing a limited number of certified contractors to participate. The contracting authority expects an integrated approach that meets current building and educational standards, with attention to inclusivity and future-proofing.

Works · Restricted · European procedure

European
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
December 20, 2021
12:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderDaltonschoolgymnasiumschool building

01What is being requested

Stichting Openbaar Onderwijs Noord has a non-public tender for the new construction of Daltonschool De Poolster, including a gymnasium. The project comprises a school building of approx. 1,893 m² GFA with capacity for approximately 300 students. The construction includes four classroom areas, a technology lab, educational learning areas, a play room, a classroom for early childhood education, office spaces, and support rooms. The associated gymnasium covers approx. 566 m² GFA. The assignment requires a modern, sustainable, and accessible learning environment, including facilities for sports and recreation. The tender focuses on a total area of 2,459 m² GFA, with an emphasis on functionality, safety, and energy efficiency. The procedure is non-public, allowing a limited number of certified contractors to participate. The contracting authority expects an integrated approach that meets current building and educational standards, with attention to inclusivity and future-proofing.

The assignment concerns the realization of Daltonschool de Poolster and an associated gymnasium with a total area of approx. 2,459 m²/GFA. The school building (1,893 m²/GFA) provides space for approximately 300 students and consists of: - Educational spaces (4 classroom areas, 1 technology lab, educational learning areas); - Play room; - Early childhood education (1 classroom area); - Office spaces; - Support rooms. The gymnasium is 566 m²/GFA.

45000000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Kernbouw B.V.SME9711×
2BINX Smartility B.V.SME9527×
3BAM Bouw en Techniek bvSME9434×
4Hegeman Bouw & Infra B.V.SME9331×
5Van Gelder BVSME9153×
6Bertens Bouw B.V.SME8713×

05Tender documents

TN337157 - SF03 Aankondiging van een gegunde opdracht 20221206115313pdfDec 6, 2022 · 23 KB
Nota van inlichtingen 2021-12-08-1pdfDec 8, 2021 · 13 KB
Uniform_Europees_Aanbestedingsdocument_Poolster versie 8-12-2021pdfDec 8, 2021 · 2098 KB
Selectieleidraad_europese_niet_openbare_procedure_de Poolster 17-11-2021pdfNov 19, 2021 · 1179 KB
Modelformulier referentiewerkendocxNov 19, 2021 · 16 KB
TN337157 - SF02 Aankondiging van een opdracht 20211117194215pdfNov 19, 2021 · 33 KB
20210901_B913_Amsterdam Poolster_Commissie ruimtelijke kwaliteitpdfNov 19, 2021 · 38878 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the size of the school building for Daltonschool De Poolster?
The school building has an area of approximately 1,893 m² GFA and provides space for approximately 300 students.
What exactly is being realized in this project?
The assignment concerns the realization of Daltonschool De Poolster and an associated gymnasium with a total area of approximately 2,459 m² GFA.
Which rooms are included in the school building?
The school building consists of four classroom areas, a technology lab, educational learning areas, a play room, a classroom area for early childhood education, office spaces, and support rooms.
What is the size of the associated gymnasium?
The associated gymnasium covers an area of 566 m² GFA.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159