New construction Dalton KC Brederode
New construction and renovation of a primary school building of approximately 2,235 m² in Santpoort-Zuid, with an emphasis on timber frame construction and integral realization.
Works · Restricted · European procedure
01What is being requested
Realization of a new school building for Dalton KC Brederode in Santpoort-Zuid, consisting of approx. 1,781 m² new construction in timber frame construction and the renovation of approx. 454 m² existing part, with a total scope of approx. 2,235 m² over a duration of 18 months.
Stichting IJmare intends to realize a new school building for Dalton KC Brederode in Santpoort-Zuid. The current school building must be largely demolished, after which approx. 1,781 m² of new construction in timber frame construction will be realized and the part to be retained of approx. 454 m² will be renovated. This will create one integral building of approx. 2,235 m². During realization, the part to be retained will remain in use.
02Outcome
Kernbouw B.V.
03Strategic insight
When selecting reference projects, focus specifically on new construction of utility buildings of the required scale. Ensure that experience with primary education is clearly highlighted in the qualitative substantiation. Take into account the limited scope of the plan of approach.
04Points of attention
05Can I take part?
06Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Award criteria
The quality value will be based on the assessment of the plan of approach.
Price
08Process & timeline
09Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
10Bidders in this segment
11Tender documents
12Legal themes that may be relevant here
13Frequently asked questions
What is the scope of the new construction and renovation?
What are the works regarding the current school building?
Automatically compiled from the official tender data and documents.
14Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159