AwardedWorksRestricted

New construction of Brede school Noordwijk aan Zee

Type
Works
Estimated value
€ 416K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Sophia Scholen is seeking executing parties for the new construction of the Brede school Noordwijk aan Zee. The assignment includes building works (including phased demolition and site preparation and a coordination obligation), mechanical engineering, and electrical engineering. The parties must be capable of collaborating on the further development of the Technical Design (TO) into a sustainable Ready for Construction Design (UO) and subsequently realizing the full construction of the school. Optionally, a maintenance period after completion may be included. The procedure is non-public, meaning the tender is targeted at a limited number of selected partners. The assignment requires an integrated approach, strong coordination, experience with sustainable construction projects, and knowledge of educational buildings. The contracting authority expects a high level of technical expertise, project management, and the ability to deliver within the specified time and budget.

Works · Restricted · National procedure

Contract type
Works
Restricted
Estimated value
€416,000
awarded value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksnew constructionschoolbuilding works

01What is being requested

Stichting Sophia Scholen is seeking executing parties for the new construction of the Brede school Noordwijk aan Zee. The assignment includes building works (including phased demolition and site preparation and a coordination obligation), mechanical engineering, and electrical engineering. The parties must be capable of collaborating on the further development of the Technical Design (TO) into a sustainable Ready for Construction Design (UO) and subsequently realizing the full construction of the school. Optionally, a maintenance period after completion may be included. The procedure is non-public, meaning the tender is targeted at a limited number of selected partners. The assignment requires an integrated approach, strong coordination, experience with sustainable construction projects, and knowledge of educational buildings. The contracting authority expects a high level of technical expertise, project management, and the ability to deliver within the specified time and budget.

For the new construction of the Brede school Noordwijk, the educational foundation Sophia Scholen is looking for executing parties for the disciplines of building works (incl. phased demolition and site preparation and coordination obligation), mechanical engineering, and electrical engineering. Executing parties must be capable of participating in the further development of the Technical Design (TO)/specification into a sustainable Ready for Construction Design (UO) and subsequently realizing the Brede school. Optionally, maintenance for a period to be determined may become part of the assign

Works

02Outcome

Awarded

Steegman Elektrotechniek BV

Award value
€416,000

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Schoonderbeek Installatie b.v. potentialSME40
2Schulte & Lestraden B.V. potentialSME40
3Steegman Elektrotechniek BV potentialSME40
4Willems-Uden Technische Installaties potentialUnknown40
5BM Utiliteit B.V. potentialSME40
6Herlings Elektro Techniek B.V. potentialSME40

05Tender documents

TN328191 - SF03 Aankondiging van een gegunde opdracht 20220127154541pdfJan 27, 2022 · 48 KB
Nota van inlichtingen 20210927zipSep 27, 2021 · 167 KB
Selectiestukken 20210907zipSep 7, 2021 · 2729 KB
TN328191 - SF02 Aankondiging van een opdracht 20210907171102pdfSep 7, 2021 · 40 KB

06Legal themes that may be relevant here

07Frequently asked questions

What work is expected during the design phase?
Executing parties must be capable of participating in the further development of the Technical Design (TO)/specification into a sustainable Ready for Construction Design (UO).
Is there a possibility for maintenance after the school is completed?
Yes, an optional maintenance period for a period to be determined may become part of the assignment after completion.

Automatically compiled from the official tender data and documents.