ClosedWorksRestricted

National tender according to the non-public procedure for a construction team for the new construction of Kindcentrum de Sprong

OPTIMUS primair onderwijs · Restricted · 1 lots · 336134
Type
Works
45000000
Estimated value
€ 4,20M
estimated
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

National non-public tender for the realization of a new child center by a construction team, where the focus lies on the development of the technical design and the subsequent construction.

Works · Restricted · National procedure

Complete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
€4,200,000
estimated value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksconstruction teamengineering teamtechnical design

01What is being requested

The realization of a construction team for the new construction of Kindcentrum De Sprong, whereby the contractor is responsible for the development of the technical design and the full realization of the building and installation technology part.

The new construction of KC De Sprong must be realized by selecting and contracting one (combination of) contractor(s), who in an engineering team develops a final design into a technical design (TO) and thereby is also provided the opportunity to realize the work. The (combination of) contractor(s) is fully responsible for both the building and the installation technology part of the assignment. In the first phase, the (combination of) contractor(s) develops the final design up to and including a technical design. After completion of the technical design with the associated final budget, a con

45000000€ 4,20MWorks
1Selection for a construction team for the new construction of Kindcentrum de Sprong€4,200,000

02Strategic insight

Strategic insight · AI analysis
Ensure a reference assignment that exactly meets the combination of content, scope, and value. In the case of a combination, pay attention to the required joint and several liability and the correct documentation from third parties. Submit the application form in a timely and complete manner to prevent exclusion.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The European Single Procurement Document must be submitted fully, correctly, and signed validly.Important
When relying on third-party resources, the bidder is jointly and severally liable.Important
Questions must be asked exclusively via the specific format in the messages module of TenderNed.Important
The assignment for the execution phase will only be awarded if agreement has been reached regarding the design and the costs.Important

04Can I take part?

Financial · 1
Sufficient financial and economic capacity, no known claims that jeopardize continuity, and an auditor's report without a continuity paragraph.Financial
Technical · 1
One relevant reference assignment of a child center (education, BSO, and childcare) as a member of a construction team with a size of at least 1,000 m2 bvo and a value of at least € 2,500,000.00 executed in the period 2018-2024.Technical
Other · 1
Possession of a VCA certificate as a company and NEN-EN-ISO 9001:2015 certified quality system or equivalent.Other

05Award criteria

Best price-quality ratioweight n/a

The award takes place on the basis of the best price-quality ratio with sub-award criteria Price, Quality, and Presentation with a weighting of 30/60/10 respectively.

06Process & timeline

Announcement
13 mei 2024
Deadline for questions selection phase
22 mei 2024
Memorandum of information selection phase
27 mei 2024
Deadline for application
3 juni 2024
Rejection of candidates
4 juni 2024
Objection period selection phase
11 juni 2024
Invitation to tender
17 juni 2024
Deadline for questions award phase
27 juni 2024
Memorandum of information award phase
2 juli 2024
Final deadline for bids
9 juli 2024
Presentations
11 juli 2024
Provisional award
12 juli 2024
Definitieve gunning
2 augustus 2024
Start uitwerken definitief ontwerp tot technisch ontwerp
augustus 2024
Start bouw
januari 2025
Ingebruikname
november 2025

07Value in context

€4,200,000

08Likely competitors

#Likely bidderFitWins
1BINX Smartility B.V.SME9827×
2Hegeman Bouw & Infra B.V.SME9631×
3Dura Vermeer Infra Regionale Projecten BVSME9458×
4Kernbouw B.V.SME9411×
5Unica Installatietechniek B.V.SME9013×
6Facilicom Solutions B.V.SME8714×

09Tender documents

Nota van inlichtingen selectiefasepdfMay 27, 2024 · 100 KB
TN467211 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240513193650pdfMay 13, 2024 · 11 KB
Bijlage 4 Uniform Europees AanbestedingsdocumentpdfMay 13, 2024 · 2107 KB
Selectieleidraad KC De SprongpdfMay 13, 2024 · 245 KB
Bijlage 2 AanmeldingsformulierdocxMay 13, 2024 · 39 KB
Bijlage 3 CombinatieverklaringdocxMay 13, 2024 · 25 KB
Bijlage 1 Format vragendocxMay 13, 2024 · 27 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the specific assignment description for the construction team?
The construction team, consisting of one or more contractors, develops the final design into a technical design (TO) in the first phase. The team is fully responsible for both the building and the installation technology part of the new construction of Kindcentrum de Sprong.
How does the cooperation between the engineering phase and the realization proceed?
After completion of the technical design and the associated final budget, a contract for the execution phase may or may not be agreed upon. In this execution phase, the further development into a ready design and the final realization takes place.
What are the requirements for submitting the application in a combination of parties?
If you apply in combination with other parties, then each combining party must submit a fully completed and signed copy of the application form.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,2 mln

Gegunde waarden in CPV 45 · werken n=3159