The Province of Noord-Holland intends to award a contract for design and execution works focused on the reconstruction and major maintenance of the N247 via a competitive dialogue. The procedure is aimed at selecting a technically and financially suitable partner capable of developing an integrated concept, including feasibility studies, design, project management, and execution. The tender requires a detailed technical proposal, a realistic schedule, a cost estimate, and a risk management plan. The contracting authority emphasizes quality, sustainability, safety, and minimal traffic disruption.

Works · Competitive dialogue · European procedure

European
Contracting authority
Contract type
Works
Competitive dialogue
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Haarlem
CharacteristicsCPV 45WorksEU tenderN247reconstructionmajor maintenance

01What is being requested

The Province of Noord-Holland intends to award a contract for design and execution works focused on the reconstruction and major maintenance of the N247 via a competitive dialogue. The procedure is aimed at selecting a technically and financially suitable partner capable of developing an integrated concept, including feasibility studies, design, project management, and execution. The tender requires a detailed technical proposal, a realistic schedule, a cost estimate, and a risk management plan. The contracting authority emphasizes quality, sustainability, safety, and minimal traffic disruption.

The Contracting Authority intends to award a contract for the realization of design and execution works for the purpose of the reconstruction and major maintenance on and around the N247. The procurement procedure will be conducted according to the competitive dialogue.

45233130Works
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Heijmans Infra B.V.SME10065×
3Boskalis Nederland B.V.SME10069×
4BAM Infra B.V.SME9977×
5Combinatie Heijmans - SWARCOUnknown9873×
6Dura Vermeer Infra Regionale Projecten BVSME9858×

05Tender documents

TN219536 - SF03 Aankondiging van een gegunde opdracht 20200911165234pdfSep 11, 2020 · 26 KB
NvI N247pdfMay 17, 2019 · 32 KB
Aanbestedingsdocumenten Selectiefase RecoN247zipMay 1, 2019 · 1578 KB
TN219536 - SF02 Aankondiging van een opdracht 20190501180319pdfMay 1, 2019 · 35 KB
In zes stappen digitaal inschrijven op overheidsopdrachten via TenderNedpdfMay 1, 2019 · 431 KB
TN219536 - SF01 Vooraankondiging 20190412172223pdfApr 12, 2019 · 18 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the objective of the works for the N247?
The contract concerns the realization of design and execution works for the purpose of the reconstruction and major maintenance on and around the N247.
What is expected of the technical and financial partner?
The contracting authority is looking for a partner capable of developing an integrated concept, including feasibility studies, design, project management, and execution.
Which aspects does the contracting authority emphasize during execution?
The contracting authority emphasizes quality, sustainability, safety, and minimal traffic disruption.
Which components must be included in the technical proposal?
The proposal must contain a detailed technical plan, a realistic schedule, a cost estimate, and a risk management plan.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159