Multifunctional Accommodation Hilversum.
The Municipality of Hilversum intends to realize a multifunctional building (MFA Hilversum Zuid) as replacement housing for the community center De Lelie, the after-school care facility De Basisbende, and other partners (Paulusschool, Bink Kinderopvang, Versa Welzijn, Jeugd & Gezin). The project is a works contract via a non-public procedure. The building must comply with Dutch construction and safety standards, including fire safety, accessibility, and sustainability, and must integrate seamlessly with the existing school infrastructure. The schedule requires rapid delivery, as current activities are temporarily taking place at the Paulusschool. The municipality expects a design and construction phase with clear requirements for capacity, multifunctional spaces, technical installations, and cost-efficient execution. The tender focuses on a party with experience in public, social, and educational infrastructure.
Works · Restricted · European procedure
01What is being requested
The Municipality of Hilversum intends to realize a multifunctional building (MFA Hilversum Zuid) as replacement housing for the community center De Lelie, the after-school care facility De Basisbende, and other partners (Paulusschool, Bink Kinderopvang, Versa Welzijn, Jeugd & Gezin). The project is a works contract via a non-public procedure. The building must comply with Dutch construction and safety standards, including fire safety, accessibility, and sustainability, and must integrate seamlessly with the existing school infrastructure. The schedule requires rapid delivery, as current activities are temporarily taking place at the Paulusschool. The municipality expects a design and construction phase with clear requirements for capacity, multifunctional spaces, technical installations, and cost-efficient execution. The tender focuses on a party with experience in public, social, and educational infrastructure.
In 2017, community center De Lelie was destroyed by fire. The former community center, located directly next to the Paulusschool in Hilversum Zuid, provided shelter for a wide range of activities and initiatives aimed at various groups in society. Currently, De Lelie is using spaces in the Paulusschool. Similarly, the after-school care facility De Basisbende (Bink Kinderopvang) is using spaces in the Paulusschool. Together with community center De Lelie and BSO De Basisbende, the Paulusschool now forms the Brede School Bloemenkwartier. Replacement housing is required for De Lelie. This replace
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the purpose of the realization of the MFA Hilversum Zuid?
Which organizations are using the current temporary housing?
What is the intended function of the new multifunctional accommodation?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln