OpenServicesEuropeanOpen

Monitoring groundwater levels groundwater monitoring network Municipality of Emmen 2026-2033

Gemeente Emmen · Open · 1 lots · 427994
Type
Services
71351500 · Soil investigation ser
Estimated value
€ 350K
estimated
To deadline
95d
Sep 18, 2026 · 15:00
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This tender concerns the management and monitoring of a groundwater monitoring network for the Municipality of Emmen over the period [phone number removed]. The assignment covers the entire chain: from telemetric equipment and maintenance to data validation and disclosure via a portal and delivery to the BRO. It is an integrated service provision in which the contractor remains the owner of the equipment.

Services · Open · European procedure

European
Contracting authority
Gemeente Emmen
Drenthe
Contract type
Services
Open
Estimated value
€350,000
estimated value
Submission deadline
September 18, 2026
15:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Soil investigation services
Location
Emmen, Drenthe
CharacteristicsCPV 71ServicesEU tenderGroundwaterMonitoringObservation well

01What is being requested

This tender concerns the management and monitoring of a groundwater monitoring network for the Municipality of Emmen over the period [phone number removed]. The assignment covers the entire chain: from telemetric equipment and maintenance to data validation and disclosure via a portal and delivery to the BRO. It is an integrated service provision in which the contractor remains the owner of the equipment.

The assignment concerns the (continuation of) the daily collection, storage, and provision of reliable groundwater level measurements to the Municipality of Emmen and to the BRO. The contractor is responsible for the telemetric measuring equipment, validation of the measurement data, and making the measurement data available via an internet application. The Municipality of Emmen will not become the owner of the measuring equipment. The responsibility for the measuring equipment, management and maintenance, data processing, data validation, data storage, and the presentation of the data in a p

71351500€ 350KServices
1Monitoring groundwater levels groundwater monitoring network Municipality of Emmen 2026-2033€350,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€350,000

04Likely competitors

#Likely bidderFitWins
1RPS advies- en ingenieursbureau B.V.SME9838×
2Arcadis Nederland B.V.SME97153×
3Haskoning Nederland B.V.SME97131×
4Sweco Nederland B.V. SME9796×
5Tauw bvSME9753×
6Antea Nederland BVSME9677×

05Tender documents

Bijlage 12 Standaarden ICT-Infrastructuur v2.6.pdfpdfJun 7, 2026 · 404 KB
260604 Leidraad grondwatermeetnet Emmen.pdfpdfJun 7, 2026 · 1015 KB
Beschrijving.pdfpdfJun 7, 2026 · 36 KB
Bijlage 2 - Concept Wachtkamerovereenkomst.pdfpdfJun 7, 2026 · 366 KB
Bijlage 1 - Concept overeenkomst.pdfpdfJun 7, 2026 · 545 KB
Inschrijvingsfase.pdfpdfJun 7, 2026 · 30 KB
Prijslijst.pdfpdfJun 7, 2026 · 32 KB
Bijlage 6 - Standaardformat Referenties.docxdocxJun 7, 2026 · 19 KB
Gunningscriteria.pdfpdfJun 7, 2026 · 32 KB
Bijlage 4 - GIBIT 2025.pdfpdfJun 7, 2026 · 348 KB
Bijlage 5 - Verklaring Sanctiepakket Rusland.docxdocxJun 7, 2026 · 14 KB
Aanbestedingsdocumenten.pdfpdfJun 7, 2026 · 41 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the assignment regarding the equipment?
The contractor bears full responsibility for the telemetric measuring equipment, including the management and maintenance. The Municipality of Emmen will not become the owner of the equipment.
What is the expected duration of the agreement?
The assignment for monitoring the groundwater monitoring network has a duration of 2026-2033.
Which specific tasks must the contractor perform regarding the data?
The contractor is responsible for the validation of the measurement data, the storage and presentation via an internet application, as well as the delivery to the BRO.
Which mandatory selection requirement must a bidder meet?
Bidders must be able to provide validated data to the BRO.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
€ 350K

Gegunde waarden in CPV 71 · diensten n=2713