Modification of Separation Plant - adjusting NIR 6 behind NIR 10
AEB Amsterdam is conducting a public EU procurement to realize modifications to the separation plant for household waste. The assignment focuses on adjusting the configuration and structural design of the transport installations that control the separation streams NIR 6 and NIR 10 via Near InfraRed scanners. Emphasis is placed on a short lead time, as downtime causes direct loss of revenue; therefore, a rapid start of the works is essential. The award criteria are established in the tender documents.
Services · Open · European procedure
01What is being requested
AEB Amsterdam is conducting a public EU procurement to realize modifications to the separation plant for household waste. The assignment focuses on adjusting the configuration and structural design of the transport installations that control the separation streams NIR 6 and NIR 10 via Near InfraRed scanners. Emphasis is placed on a short lead time, as downtime causes direct loss of revenue; therefore, a rapid start of the works is essential. The award criteria are established in the tender documents.
With this public EU procurement, AEB aims to conclude an agreement for performing modifications to the configuration and adjustments to the structural design of the transport installations for the separation streams NIR 6 and NIR 10, which are controlled by Near InfraRed (NIR) scanners, as located at the Separation Plant (SI) for household waste of AEB. The SI seeks to keep the execution lead time as short as possible, as downtime is equivalent to loss of revenue, and attaches importance to being able to start the assignment as quickly as possible. The award criteria and associated scoring/as
02Outcome
Anton Industrial Services B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What is the purpose of the modifications to the separation plant?
Why is a rapid start of the works essential?
Which installations do the works focus on?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 295K
€ 672K
€ 1,5 mln
Gegunde waarden in CPV 51 · diensten n=96