PlannedSuppliesMarktconsultatie
Mobile Power Supply
N.V. Nederlandse Gasunie · Marktconsultatie · 1 lots · 420251
5
5 of 6 core insights found
Measures presence, not accuracy · documents remain authoritative
ScopeAdvicePoints of attentionSuitability requirementsAward criteriaTimeline
Type
Supplies
31100000 · Electric motors, elect
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high
Gasunie is conducting a market consultation to gather information for a planned EU procurement of mobile power supplies. The objective is to test the feasibility of requirements and to map market developments.
Supplies · Marktconsultatie · National procedure
Complete timeline
CharacteristicsCPV 31Supplies
01What is being requested
This concerns a market consultation for the supply of Mobile Power Supply (for electrical power supply). Gasunie is investigating the possibilities for a framework agreement for the supply via purchase, lease, rental or other options.
Market consultation Mobile Power Supply
1Mobile Power Supply—
02Strategic insight
Strategic insight · AI analysis
Focus on sustainability and innovation, as Gasunie explicitly asks for innovations that reduce the carbon footprint or reduce waste. Ensure a clear answer regarding flexibility in production capacity to deal with uncertain demand caused by the energy transition. Explore the possibilities for different contract forms (rental, lease, purchase) to meet the needs of Gasunie.
03Points of attention
Important · 6
The market consultation is non-binding for both Gasunie and participants.Important
Participation in the market consultation offers no advantage or disadvantage in the future procurement procedure.Important
All costs for participation are at the expense of the participant.Important
Responses to questions are treated anonymously.Important
Use exclusively the provided format for submitting the questionnaire.Important
Questions must be sent to the specific email address with a specific subject line.Important
04Award criteria
Sustainabilityweight n/a
Sustainability will be an important criterion in the selection and award process. Gasunie maps indirect greenhouse gas emissions in the value chain.
05Process & timeline
Publication of market consultation
15-04-2026
Deadline for submitting questions
11-05-2026
Answers to questions by Gasunie
15-05-2026
Submission of final response by participants
25-05-2026
06Value in context
Estimate not published
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
07Likely competitors
#Likely bidderFitWins
1Technische Unie B.V.SME7311×
2Powercon A/SUnknown671×
3Hitachi Energy The Netherlands BVSME646×
4GE Nederland B.V.SME604×
5Croonwolter&dros B.V.SME573×
6Genpower B.V.SME571×
08Tender documents
QuestionsdocxApr 15, 2026 · 27 KB
Annex 1. Specifications case 1, 2 and 3xlsxApr 15, 2026 · 16 KB
marketconsultation Mobile Power SupplypdfApr 15, 2026 · 424 KB
TN583003 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260415155403pdfApr 15, 2026 · 169 KB
09Legal themes that may be relevant here
Advies 48> Europese niet-openbare procedure voor werktuigkundige en elektrotechnische installaties van de nieuwbouw van een multifunctionelAdvies 53> Europese openbare procedure voor een overheidsopdracht tot het verrichten van diensten bestaande uit (dagelijks en periodiek) scAdvies 59> Meervoudig onderhandse aanbestedingsprocedure met betrekking tot een opdracht voor de levering van postdiensten en bezorging. InAdvies 98> Europese openbare aanbestedingsprocedure voor een raamovereenkomst met één ondernemer voor het vervangen van armaturen (straatveAdvies 451> Beklaagden hebben op 29 mei 2017 een Europese openbare aanbestedingsprocedure aangekondigd voor een raamovereenkomst per perceel
10Frequently asked questions
What technical compatibility is required for the supply?
The supplier must provide evidence of the technical compatibility of the mobile power supply with the existing infrastructure.
Which suitability requirements must the supplier meet?
Bidders must have experience in supplying mobile energy solutions to industrial or public entities and possess the technical capacity to deliver the required power and flexibility in a mobile form.
What financial and contractual conditions are set?
The financial stability of the supplier and the possibility to sign a mid-term contract, if ultimately necessary, are requested.
Through which platform must the bids be submitted?
All bids must be submitted via the TenderNed platform.
Automatically compiled from the official tender data and documents.
11Estimated value versus the market
p25
€ 260K
€ 260K
median
€ 526K
€ 526K
p75
€ 1,4 mln
€ 1,4 mln
deze opdracht
Gegunde waarden in CPV 31 · leveringen n=168